- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello all!
My organization is trying to create a schedule of sorts, or a way to take off data for materials being used as projects one of which is a floor system with joists and 3/4" sub floor + 3/4" finished floor. I see that there's a slab object that matches this, but I'm wondering if theres any way to automatically extract some data from the object with regards to the area (Square footage) for the flooring and linear footage for the boards used on the perimeter...I know I can draw a rectangle but was hoping there was a more streamlined way if possible. Thanks in advance.
Solved! Go to Solution.
Link copied