cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Modify Revision date,mark in drawings

Modify Revision date,mark in drawings

Hi All,

I want to add  a request to advanced steel Team . We  have gone through AS2015 to AS2021 . 

But we are not able to modify revision date, revision mark in one go in All drawings once it was revision was added  as tekla does.  We have to open every drawing one by one and then we modify the revisions. It is time taking process for big jobs having 1000 of dwg file . If we have this option it will save our time thanks .

@Sebastian_Eiche  . Please look into this..

6 Comments
TvdH1981
Advocate

I don't understand the matter in hand. It always does it automatically. If you select your drawings and revise them from A to B they all go at ones.

ArjunGaba
Collaborator

@TvdH1981  You can make first and all next revision in All drawings at same time But you can't modify revision date, time in the previous revision in one go One has to open the each drawing and change it manually.. 

TvdH1981
Advocate

the date also updates when revised. 

ArjunGaba
Collaborator

@TvdH1981  it is not possible what you are saying 

IR8ASU1
Enthusiast

Editing existing revision numbers to multiple drawings in one go has been requested several times over the past few years. Please add your vote to these other requests via the links below.

 

https://forums.autodesk.com/t5/advance-steel-ideas/better-revision-control/idi-p/8973979

 

https://forums.autodesk.com/t5/advance-steel-ideas/select-multiple-drawing-files-to-edit-revision-nu...

 

https://forums.autodesk.com/t5/advance-steel-ideas/please-make-revision-control-clouds-more-user-fri...

 

ArjunGaba
Collaborator

@IR8ASU1  Thanks for the vote Jim😊

Can't find what you're looking for? Ask the community or share your knowledge.

Submit Idea  

Autodesk Design & Make Report