When coping a complete assembly in the model via the Advance copy dialog box, the joints break their link to the master. Then we have to be relinked the joints to the master connection. The relinking process is painful as only one joint can be added at a time to the master. Which leads me to my next idea, Multiple add joints to Joint group (master joint)