Hello,
A large percentage of our time cleaning the drawings is moving main views and section views first after creating a drawing, and after that after detail update, section views get back to their original position.
It would be helpful if we had the option to "nail" (anchor) the location of a detail view. Anchor points to be end of system line (left for beams and bottom for columns), and system line for section views.
This will stop views from messing up.



