3-Load Joint (Node) by Default
I would recommend to include in the new coming Power Pack a command named ‘’Load a Node’’.
Just with a double click, or right click and select the command ‘’Load Node’’ to get automatically by default the specific Joint in four equal different views, instead to use the View commands and create the four equal views.