Cost items in the Changer order workflow have their own number systems, which makes sense if the cost items are created first then linked to a PCO. The problem with that is if the log gets heavy, it can be difficult to track specific cost items to their associated Changer order. Can there be a way to give the Cost items a prefix (or suffix) that coincides with the Changer or number (or name) to make it easier to view, sort or filter list?