    <title>topic Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages. in Structural Bridge Design Forum</title>
    <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10309999#M1345</link>
    <description>&lt;P&gt;Hi Simon Thank you for your attention to my issue. Actually I need to tension these tendons Type 4 at the first construction stage. Because of a tight time schedule for this project I have decided to use a system of equivalent forces to model these tendons - I am going to include these forces into a dead load combination for the first stage of construction.&lt;BR /&gt;Vladimir&lt;/P&gt;</description>
    <pubDate>Thu, 13 May 2021 07:30:06 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2021-05-13T07:30:06Z</dc:date>
    <item>
      <title>Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10305013#M1338</link>
      <description>&lt;P&gt;Hi,Could you help me to decide this issue. At first I have created the model with only one construction stage, with post tensioned tendons and the program calculated it properly, including influence lines generations and live loading optimizations. But after dividing the model by two construction stages, because of post tension reasons, the program has started interrupt calculations without making an analysis log file.&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank you in advance, Vladimir&lt;/P&gt;&lt;DIV class="mceNonEditable lia-copypaste-placeholder"&gt;&amp;nbsp;&lt;/DIV&gt;&lt;DIV class="mceNonEditable lia-copypaste-placeholder"&gt;&amp;nbsp;&lt;/DIV&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 11 May 2021 11:04:37 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10305013#M1338</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-05-11T11:04:37Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10305071#M1339</link>
      <description>&lt;P&gt;Hi Vladimir,&lt;/P&gt;&lt;P&gt;Thanks for attaching your model. This sound like a memory problem but I can’t be sure until I have tried running it myself, later today. &amp;nbsp;Try increasing the memory settings from the options menu.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;let me know if you have any luck, otherwise I will contact you as soon as I have more to suggest.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;kind regards&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Dave Geeves&lt;/P&gt;</description>
      <pubDate>Tue, 11 May 2021 11:26:26 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10305071#M1339</guid>
      <dc:creator>dave_geeves</dc:creator>
      <dc:date>2021-05-11T11:26:26Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10305109#M1340</link>
      <description>&lt;P&gt;Hi, Dave Thank you for your reply. I have tried to increase the memory for an analysis but it did not help.&lt;/P&gt;&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ASBD MeM.jpg" style="width: 400px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/917536iF805F65794BE933A/image-size/medium?v=v2&amp;amp;px=400" role="button" title="ASBD MeM.jpg" alt="ASBD MeM.jpg" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;FYI It's interrupted after compiling data for the loadcases at the construction stage 2&lt;/P&gt;&lt;P&gt; &lt;/P&gt;&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ASBD Analysis.jpg" style="width: 400px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/917540iC00141CEEF595584/image-size/medium?v=v2&amp;amp;px=400" role="button" title="ASBD Analysis.jpg" alt="ASBD Analysis.jpg" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt; &lt;/P&gt;</description>
      <pubDate>Tue, 11 May 2021 11:42:20 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10305109#M1340</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-05-11T11:42:20Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10306427#M1341</link>
      <description>&lt;P&gt;Hi Vladimir,&lt;/P&gt;&lt;P&gt;It has taken me a while to make any progress on this as I needed to understand your model and how the staged construction was working.&amp;nbsp; You were correct that it is not really a memory problem so I first changed the memory requirements to a large model.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I first noticed that when I opened the tendon definition form when in Stage 2 construction I get an "EEFACE" error when looking at the stressing details and the tendon forces were not being shown.&amp;nbsp; This is an internal error so only the developers will be able to debug this problem.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;However,&amp;nbsp; I then inspected your construction stages and noticed that in stage 2 you made 4 tendons inactive which you had previously stressed in stage 1.&amp;nbsp; This didn't seem logical as you can't remove already stressed tendons (you can of course "destress" them if necessary in the tendon definition form or set them to "no Change").&amp;nbsp; When I set these four tendons to "No Change" then the error message I was getting previously disappeared and I was able to get further with the analysis.&amp;nbsp; In fact the analysis completes but it seems to fail in processing the results ready for the results viewer.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I will need to investigate this problem a bit more tomorrow but it is generally an inconsistency in the structure between stages where there are too many or few results that are expected.&amp;nbsp; Again only the developers would be able to debug this efficiently to see what the inconsistency may be.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I will keep you posted if I find a solution.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;|Kind regards&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Dave Geeves&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 11 May 2021 20:13:38 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10306427#M1341</guid>
      <dc:creator>dave_geeves</dc:creator>
      <dc:date>2021-05-11T20:13:38Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10307313#M1342</link>
      <description>&lt;P&gt;Hi, Dave.&lt;/P&gt;&lt;P&gt;Thank you for the information, I hope the developers will decide this problem soon.&lt;/P&gt;&lt;P&gt;As about these four inactive tendon - it was my misunderstanding. You are right, I am going to stress the tendons at a first construction stage, to reduce first losses, and keep the tendons as they are on a second construction stage. So, as far as I understand you, I should set them to "no change" at the second construction stage.&lt;/P&gt;&lt;P&gt;Sincerely, Vladimir&lt;/P&gt;</description>
      <pubDate>Wed, 12 May 2021 06:53:39 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10307313#M1342</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-05-12T06:53:39Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10307331#M1343</link>
      <description>&lt;P&gt;FYI, I am working with version 20.2.140.0 of the program. I saw that there are&amp;nbsp;newer versions but I can not get them because they are missing in my Autodesk Desktop App (I am using corporate floating license)&lt;/P&gt;</description>
      <pubDate>Wed, 12 May 2021 07:11:11 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10307331#M1343</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-05-12T07:11:11Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10309155#M1344</link>
      <description>&lt;P&gt;Hi Vladimir&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;I was able to get a successful analysis by making all the tendons &lt;STRONG&gt;inactive&lt;/STRONG&gt; at stage 1 (via the Construction Stages form).&amp;nbsp; Was that your intention as I see there were a couple of tendon parts that were &lt;STRONG&gt;active&lt;/STRONG&gt; at stage 1?&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Screenshot 2021-05-12 155107.png" style="width: 701px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/918162iDB481D90C67860B1/image-size/large?v=v2&amp;amp;px=999" role="button" title="Screenshot 2021-05-12 155107.png" alt="Screenshot 2021-05-12 155107.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Simon&lt;/P&gt;</description>
      <pubDate>Wed, 12 May 2021 19:51:48 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10309155#M1344</guid>
      <dc:creator>simon_hooper</dc:creator>
      <dc:date>2021-05-12T19:51:48Z</dc:date>
    </item>
    <item>
      <title>Re: Unexpected interruption of calculation. Model of PT RC viaduct with post tensioned rib slab superstructure.  Two construction stages.</title>
      <link>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10309999#M1345</link>
      <description>&lt;P&gt;Hi Simon Thank you for your attention to my issue. Actually I need to tension these tendons Type 4 at the first construction stage. Because of a tight time schedule for this project I have decided to use a system of equivalent forces to model these tendons - I am going to include these forces into a dead load combination for the first stage of construction.&lt;BR /&gt;Vladimir&lt;/P&gt;</description>
      <pubDate>Thu, 13 May 2021 07:30:06 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/structural-bridge-design-forum/unexpected-interruption-of-calculation-model-of-pt-rc-viaduct/m-p/10309999#M1345</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-05-13T07:30:06Z</dc:date>
    </item>
  </channel>
</rss>
