<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Revit linked models not aligned in Revit Cloud Worksharing Forum</title>
    <link>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7535112#M4220</link>
    <description>&lt;P&gt;Thank you for your help.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I tried the second option. So I opened my file, linked their models and acquired the coordination. Then the revit told me the coordination is the same as the acquired one.&lt;/P&gt;&lt;P&gt;The links are still not aligned.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;My question:&lt;/P&gt;&lt;P&gt;Since these two links doesn't aligned, is this the problem from one of the links instead of my project setup?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Fri, 10 Nov 2017 18:57:51 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2017-11-10T18:57:51Z</dc:date>
    <item>
      <title>Revit linked models not aligned</title>
      <link>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7532236#M4218</link>
      <description>&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I am new to Revit, and have a question about linking model.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I received two models from the architect. One is the "site plan" model, another is the "building A" model. So I need to build my electrical work based on these two linked models.&amp;nbsp;&lt;/P&gt;&lt;P&gt;Then, the BIM plan says we should link them "origin to origin" with a specific project base point. The survey point is 0,0,0, also based on BIM.&lt;/P&gt;&lt;P&gt;I set up my project base point, and link these two models using "origin to origin".&lt;/P&gt;&lt;P&gt;Unfortunately, the "site" doesn't align with "building A".&lt;/P&gt;&lt;P&gt;How can I fixed it? Please help.&lt;/P&gt;&lt;P&gt;I checked the project based point in side the "building A". It is the same as the BIM one, while the one inside the "site" has a different "angle to the north".&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Please Help. Thank you.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 09 Nov 2017 21:46:54 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7532236#M4218</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-11-09T21:46:54Z</dc:date>
    </item>
    <item>
      <title>Re: Revit linked models not aligned</title>
      <link>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7534725#M4219</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;@Anonymous wrote:&lt;BR /&gt;&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I am new to Revit, and have a question about linking model.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I received two models from the architect. One is the "site plan" model, another is the "building A" model. So I need to build my electrical work based on these two linked models.&amp;nbsp;&lt;/P&gt;&lt;P&gt;Then, the BIM plan says we should link them "origin to origin" with a specific project base point. The survey point is 0,0,0, also based on BIM.&lt;/P&gt;&lt;P&gt;I set up my project base point, and link these two models using "origin to origin".&lt;/P&gt;&lt;P&gt;Unfortunately, the "site" doesn't align with "building A".&lt;/P&gt;&lt;P&gt;How can I fixed it? Please help.&lt;/P&gt;&lt;P&gt;I checked the project based point in side the "building A". It is the same as the BIM one, while the one inside the "site" has a different "angle to the north".&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Please Help. Thank you.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&amp;nbsp;&lt;/P&gt;&lt;HR /&gt;&lt;/BLOCKQUOTE&gt;&lt;P&gt;You can do one of two things.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Option 1:&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;Open their model and link yours in&lt;/LI&gt;&lt;LI&gt;Move your model into proper position&lt;/LI&gt;&lt;LI&gt;Publish Coordinates to your model&lt;/LI&gt;&lt;LI&gt;Save the project&lt;/LI&gt;&lt;/UL&gt;&lt;P&gt;Option 2:&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;Link their model into yours&lt;/LI&gt;&lt;LI&gt;Move their model into position&lt;/LI&gt;&lt;LI&gt;Acquire coordinates from their model&lt;/LI&gt;&lt;/UL&gt;</description>
      <pubDate>Fri, 10 Nov 2017 16:35:02 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7534725#M4219</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-11-10T16:35:02Z</dc:date>
    </item>
    <item>
      <title>Re: Revit linked models not aligned</title>
      <link>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7535112#M4220</link>
      <description>&lt;P&gt;Thank you for your help.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I tried the second option. So I opened my file, linked their models and acquired the coordination. Then the revit told me the coordination is the same as the acquired one.&lt;/P&gt;&lt;P&gt;The links are still not aligned.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;My question:&lt;/P&gt;&lt;P&gt;Since these two links doesn't aligned, is this the problem from one of the links instead of my project setup?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 10 Nov 2017 18:57:51 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7535112#M4220</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-11-10T18:57:51Z</dc:date>
    </item>
    <item>
      <title>Re: Revit linked models not aligned</title>
      <link>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7535155#M4221</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;@Anonymous wrote:&lt;BR /&gt;
&lt;P&gt;Thank you for your help.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;I tried the second option. So I opened my file, linked their models and acquired the coordination. Then the revit told me the coordination is the same as the acquired one.&lt;/P&gt;
&lt;P&gt;The links are still not aligned.&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;My question:&lt;/P&gt;
&lt;P&gt;Since these two links doesn't aligned, is this the problem from one of the links instead of my project setup?&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;HR /&gt;&lt;/BLOCKQUOTE&gt;
&lt;P&gt;The second option involves manually aligning the linked models in your project.&amp;nbsp; Did you do that?&lt;/P&gt;</description>
      <pubDate>Fri, 10 Nov 2017 19:11:38 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/7535155#M4221</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2017-11-10T19:11:38Z</dc:date>
    </item>
    <item>
      <title>Re: Revit linked models not aligned</title>
      <link>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/14264949#M11170</link>
      <description>&lt;P&gt;Hi ToanDN&lt;/P&gt;&lt;P&gt;I have exact same problem however when i either append or export to nwc all model in naviswork line up perfectly fine.&lt;/P&gt;&lt;P&gt;what could be causing this problem&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;thank you&lt;/P&gt;</description>
      <pubDate>Mon, 14 Sep 2026 05:37:14 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-cloud-worksharing-forum/revit-linked-models-not-aligned/m-p/14264949#M11170</guid>
      <dc:creator>srey.chhoeun</dc:creator>
      <dc:date>2026-09-14T05:37:14Z</dc:date>
    </item>
  </channel>
</rss>

