    <title>topic Revit Coordination with Construction Schedule in Revit Architecture Forum</title>
    <link>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048391#M317861</link>
    <description>&lt;P&gt;I am using Revit 2016 and I had one of the architects ask if Revit has the capability of illustrating the construction of the building to match the contractors schedule. So you would see the foundations going in, then the support structures, walls, roof, etc. Does Revit have this capability?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thanks in Advance!&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Fri, 19 Feb 2016 22:09:31 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2016-02-19T22:09:31Z</dc:date>
    <item>
      <title>Revit Coordination with Construction Schedule</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048391#M317861</link>
      <description>&lt;P&gt;I am using Revit 2016 and I had one of the architects ask if Revit has the capability of illustrating the construction of the building to match the contractors schedule. So you would see the foundations going in, then the support structures, walls, roof, etc. Does Revit have this capability?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thanks in Advance!&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 19 Feb 2016 22:09:31 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048391#M317861</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2016-02-19T22:09:31Z</dc:date>
    </item>
    <item>
      <title>Re: Revit Coordination with Construction Schedule</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048413#M317862</link>
      <description>Revit does not have a Big Blue Button that you can click once to create such sequencing illustrations.  It however, has enough tools for you to generate them yourself:  Phasing, Object visibility control, worksets, etc...</description>
      <pubDate>Fri, 19 Feb 2016 22:32:30 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048413#M317862</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2016-02-19T22:32:30Z</dc:date>
    </item>
    <item>
      <title>Re: Revit Coordination with Construction Schedule</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048623#M317863</link>
      <description>&lt;P&gt;You can use Revit's Phases functionality to create construction drawings that detail the work, as already mentioned. If you want to create presentation style animations of the building being constructed you'll want to look into Navisworks. Navisworks is packaged along with Revit in some of Autodesk's suite offerings.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;A href="https://www.youtube.com/watch?v=tQkDRXo7tLM" target="_blank"&gt;https://www.youtube.com/watch?v=tQkDRXo7tLM&lt;/A&gt;&lt;/P&gt;</description>
      <pubDate>Sat, 20 Feb 2016 06:38:59 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6048623#M317863</guid>
      <dc:creator>chrisplyler</dc:creator>
      <dc:date>2016-02-20T06:38:59Z</dc:date>
    </item>
    <item>
      <title>Re: Revit Coordination with Construction Schedule</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6050620#M317864</link>
      <description>&lt;P&gt;Thanks so much for the input guys! This is exactly what I was looking for.&lt;/P&gt;</description>
      <pubDate>Mon, 22 Feb 2016 15:40:40 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/6050620#M317864</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2016-02-22T15:40:40Z</dc:date>
    </item>
    <item>
      <title>Re: Revit Coordination with Construction Schedule</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/8770108#M317865</link>
      <description>&lt;P&gt;Did they use Navisworks to generate the entire animation? What other software was necessary to achieve this?&lt;/P&gt;
&lt;P&gt;Any thoughts would be greatly appreciated.&lt;/P&gt;</description>
      <pubDate>Fri, 03 May 2019 18:22:10 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/revit-coordination-with-construction-schedule/m-p/8770108#M317865</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2019-05-03T18:22:10Z</dc:date>
    </item>
  </channel>
</rss>
