<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Scheduling elements in sheets in Revit Architecture Forum</title>
    <link>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134175#M274169</link>
    <description>&lt;P&gt;As far as i know it is not possible to filter schedules "by sheet" - with the exception of a keynote legend.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;You can - however - accomplish what you're trying to do in a less than optimal way, by adding a parameter to your doors called: "Filter by sheet", then set that parameter to whatever you like for the doors on each sheet (for instance the sheet number), and then filter your schedule to "Filter by: Filter by sheet equals sheet number".&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;If your problem pertains to separate floor plans, you could also filter by level.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;But in short, no, there's no "filter by sheet" - but it's been suggested multiple times, here's a guy whose post you could upvote &lt;span class="lia-unicode-emoji" title=":slightly_smiling_face:"&gt;🙂&lt;/span&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;A href="https://forums.autodesk.com/t5/revit-ideas/schedule-filter-by-sheet-like-keynote-legend/idi-p/7064646" target="_blank"&gt;https://forums.autodesk.com/t5/revit-ideas/schedule-filter-by-sheet-like-keynote-legend/idi-p/7064646&lt;/A&gt;&lt;/P&gt;</description>
    <pubDate>Wed, 07 Jun 2017 08:55:16 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2017-06-07T08:55:16Z</dc:date>
    <item>
      <title>Scheduling elements in sheets</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7133862#M274168</link>
      <description>&lt;P&gt;HI Masters!!!&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp; &amp;nbsp;In our project, we have given door tags as shown in image, (G-B2-05-01 is Door number and DS-07 is Door type). For the same door type we have different Door number, and each door number has different dimension. We need to show door dimension schedule, only the doors in a sheets. Is there any ways to take schedules only for the elements&amp;nbsp;in a sheet. It would be great if any suggestions. Thanks in advance. &amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Door tag.PNG" style="width: 626px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/364290i299D6A4F7FF6D341/image-size/large?v=v2&amp;amp;px=999" role="button" title="Door tag.PNG" alt="Door tag.PNG" /&gt;&lt;/span&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 07 Jun 2017 06:34:01 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7133862#M274168</guid>
      <dc:creator>PrathapSekar</dc:creator>
      <dc:date>2017-06-07T06:34:01Z</dc:date>
    </item>
    <item>
      <title>Re: Scheduling elements in sheets</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134175#M274169</link>
      <description>&lt;P&gt;As far as i know it is not possible to filter schedules "by sheet" - with the exception of a keynote legend.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;You can - however - accomplish what you're trying to do in a less than optimal way, by adding a parameter to your doors called: "Filter by sheet", then set that parameter to whatever you like for the doors on each sheet (for instance the sheet number), and then filter your schedule to "Filter by: Filter by sheet equals sheet number".&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;If your problem pertains to separate floor plans, you could also filter by level.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;But in short, no, there's no "filter by sheet" - but it's been suggested multiple times, here's a guy whose post you could upvote &lt;span class="lia-unicode-emoji" title=":slightly_smiling_face:"&gt;🙂&lt;/span&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;A href="https://forums.autodesk.com/t5/revit-ideas/schedule-filter-by-sheet-like-keynote-legend/idi-p/7064646" target="_blank"&gt;https://forums.autodesk.com/t5/revit-ideas/schedule-filter-by-sheet-like-keynote-legend/idi-p/7064646&lt;/A&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 07 Jun 2017 08:55:16 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134175#M274169</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-06-07T08:55:16Z</dc:date>
    </item>
    <item>
      <title>Re: Scheduling elements in sheets</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134291#M274170</link>
      <description>&lt;P&gt;Thanks for your reply&amp;nbsp;@Anonymous,&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;As per project zone splitting method, same&amp;nbsp;areas are covered under multiple zones. so we may have same door on different sheets.&lt;/P&gt;</description>
      <pubDate>Wed, 07 Jun 2017 10:15:12 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134291#M274170</guid>
      <dc:creator>PrathapSekar</dc:creator>
      <dc:date>2017-06-07T10:15:12Z</dc:date>
    </item>
    <item>
      <title>Re: Scheduling elements in sheets</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134481#M274171</link>
      <description>&lt;P&gt;You need to create a schedule filter based on a wildcard rule:&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;- Sheets: A201, A202, A203&lt;/P&gt;
&lt;P&gt;- Doors: 001 (appears on A201, A202), 002 (appears on A202), 003 (appears on A201, A202, A203)&lt;/P&gt;
&lt;P&gt;- Create a Door instance text parameter "on Sheet", select all doors on the view on a sheet and enter:&lt;/P&gt;
&lt;P&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; Door 001: enter A201 A202&lt;/P&gt;
&lt;P&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp;&amp;nbsp;&lt;SPAN&gt;Door 002: enter A202&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;&lt;SPAN&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp;&amp;nbsp;Door 003: enter A201, A202 A203&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;SPAN&gt;- Create a schedule filter rule for each schedule: &lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;&lt;SPAN&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; Schedule on sheet A201: &amp;nbsp;if Door parameter "on Sheet" contains A201 - doors 001, 003 will show&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;&lt;SPAN&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp; Schedule on sheet A202: &amp;nbsp;if Door parameter "on Sheet" contains A202 - doors 001, 002, 003 will show&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;&lt;SPAN&gt;&amp;nbsp; &amp;nbsp; &amp;nbsp;&amp;nbsp;Schedule on sheet A203: &amp;nbsp;if Door parameter "on Sheet" contains A203 - door 003 will show&lt;/SPAN&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 07 Jun 2017 11:28:59 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/7134481#M274171</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2017-06-07T11:28:59Z</dc:date>
    </item>
    <item>
      <title>Re: Scheduling elements in sheets</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/9282901#M274172</link>
      <description>&lt;P&gt;The fact that this is &lt;STRONG&gt;&lt;U&gt;not a built in function&lt;/U&gt;&lt;/STRONG&gt; is major downfall of Revit. People are using keynote schedules to do this, losing major time and functionality. &lt;U&gt;&lt;STRONG&gt;Please include in future version.&amp;nbsp;&lt;/STRONG&gt;&lt;/U&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 29 Jan 2020 15:48:30 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/scheduling-elements-in-sheets/m-p/9282901#M274172</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2020-01-29T15:48:30Z</dc:date>
    </item>
  </channel>
</rss>

