<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Relocate the project! in Revit Architecture Forum</title>
    <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7940201#M240451</link>
    <description>&lt;P&gt;Can anyone help me to understand this workflow?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank you in advance!&lt;/P&gt;</description>
    <pubDate>Wed, 18 Apr 2018 06:12:56 GMT</pubDate>
    <dc:creator>mairh_tsek</dc:creator>
    <dc:date>2018-04-18T06:12:56Z</dc:date>
    <item>
      <title>Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837444#M240439</link>
      <description>&lt;P&gt;Hello,&lt;/P&gt;&lt;P&gt;&amp;nbsp;I am very confused with the coordinates in Revit. And now I have started to explore this more.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I have my building in an elevation 0.0 but I did my toposurface in the correct elevation. So now I need to move my building only in the coorect elevation. I tried the relocation project option, now my building have the elevation that I want but the toposurface is still higher than my building.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Could you please someone help me?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank you in advance!&lt;/P&gt;</description>
      <pubDate>Thu, 08 Mar 2018 10:16:38 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837444#M240439</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-03-08T10:16:38Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837475#M240440</link>
      <description>You should move the topo down instead of moving the building up because it can break a lot of things.</description>
      <pubDate>Thu, 08 Mar 2018 10:25:55 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837475#M240440</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2018-03-08T10:25:55Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837505#M240441</link>
      <description>&lt;P&gt;How I can do this..?&lt;/P&gt;&lt;P&gt;I went in an elevation view and tried the move commande but nothing happened.&lt;/P&gt;</description>
      <pubDate>Thu, 08 Mar 2018 10:41:01 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837505#M240441</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-03-08T10:41:01Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837530#M240442</link>
      <description>Did you untick Constrain box when you moved the topo in an elevation view?</description>
      <pubDate>Thu, 08 Mar 2018 10:47:12 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837530#M240442</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2018-03-08T10:47:12Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837598#M240443</link>
      <description>&lt;P&gt;Well I moved the toposurface and after i did relocate project to have my toposurface and the bulilding in the correct point...&lt;/P&gt;&lt;P&gt;It is wrong?&lt;/P&gt;</description>
      <pubDate>Thu, 08 Mar 2018 11:16:00 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837598#M240443</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-03-08T11:16:00Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837633#M240444</link>
      <description>&lt;P&gt;Hi..&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Move all the levels to correct Elevation and your building will set to correct heights..&lt;/P&gt;&lt;P&gt;Its good to do this in initial stage..&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;other way is move that topography down, but that may not give you correct spot elevation&lt;/P&gt;&lt;P&gt;as per topo... For this you may Create a LINK Topo file, and Link it to Building..that way you&amp;nbsp;&lt;/P&gt;&lt;P&gt;will always have Levels coming from "TOPO Link"&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;A href="https://knowledge.autodesk.com/support/revit-products/learn-explore/caas/CloudHelp/cloudhelp/2016/ENU/Revit-Collaborate/files/GUID-0625D4E1-4EE9-4848-8B44-73A75D1896DB-htm.html" target="_blank"&gt;https://knowledge.autodesk.com/support/revit-products/learn-explore/caas/CloudHelp/cloudhelp/2016/ENU/Revit-Collaborate/files/GUID-0625D4E1-4EE9-4848-8B44-73A75D1896DB-htm.html&lt;/A&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Checkout Best Practices&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;A href="https://knowledge.autodesk.com/support/revit-products/learn-explore/caas/CloudHelp/cloudhelp/2018/ENU/Revit-Model/files/GUID-AFCA59C6-9E00-4576-BCA0-63EB3342B68C-htm.html" target="_blank"&gt;https://knowledge.autodesk.com/support/revit-products/learn-explore/caas/CloudHelp/cloudhelp/2018/ENU/Revit-Model/files/GUID-AFCA59C6-9E00-4576-BCA0-63EB3342B68C-htm.html&lt;/A&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Cheers!&lt;/P&gt;</description>
      <pubDate>Thu, 08 Mar 2018 11:27:09 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837633#M240444</guid>
      <dc:creator>Corsten.Au</dc:creator>
      <dc:date>2018-03-08T11:27:09Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837692#M240445</link>
      <description>&lt;P&gt;Yes..&lt;/P&gt;&lt;P&gt;Now I place the building and the toposurface in the correct elevation but my toposurface point don't have the correct value.&lt;/P&gt;&lt;P&gt;But it is strange because I relocate the project in the elevation that I had before my toposurface..&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;So I changed the elevation of the toposurface (I put it down to the bulding) but after I brink all the project (building + toposurface) in the elevation that I had my toposurface&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 08 Mar 2018 11:51:40 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7837692#M240445</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-03-08T11:51:40Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7840260#M240446</link>
      <description>&lt;P&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/3585828"&gt;@Corsten.Au&lt;/a&gt;,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I didn't understand very well this &lt;EM&gt;' or this you may Create a LINK Topo file, and Link it to Building..that way you&amp;nbsp;&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;&lt;EM&gt;will always have Levels coming from "TOPO Link" .&amp;nbsp;&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;EM&gt;&amp;nbsp;&lt;/EM&gt;Thank you in advance!&lt;/P&gt;</description>
      <pubDate>Fri, 09 Mar 2018 06:46:39 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7840260#M240446</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-03-09T06:46:39Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7840311#M240447</link>
      <description>&lt;P&gt;Unclip the project base point and move it down.&amp;nbsp; Then reclip it.&lt;/P&gt;</description>
      <pubDate>Fri, 09 Mar 2018 07:21:25 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7840311#M240447</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2018-03-09T07:21:25Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7840387#M240448</link>
      <description>Spot elevation shows as per project ..and not as per link.&lt;BR /&gt;&lt;BR /&gt;Consider in project : ground floor is at 10’-00&lt;BR /&gt;And liked unit is ground floor 0’-0”&lt;BR /&gt;&lt;BR /&gt;When you link unit , to project .. and match ground floor of unit to ground floor or project .. you will get spot elevation as 10’-00”&lt;BR /&gt;&lt;BR /&gt;For topo.. if you have done heights correct Then once you link to the project you need to move it to match with level of topo as well..&lt;BR /&gt;next level is level as per project and level as per survey ..&lt;BR /&gt;Ex: you model unit ground 0’-0”&lt;BR /&gt;Level 10’-0”&lt;BR /&gt;Roof at 20’-0”&lt;BR /&gt;&lt;BR /&gt;Later you come to know the survey and ground floor should be at 55’-0”&lt;BR /&gt;Then just change the survey point elevation to 55’-0”&lt;BR /&gt;&lt;BR /&gt;That will change levels of unit relative to survey ..&lt;BR /&gt;Ground floor 55’-0”&lt;BR /&gt;First floor 66’-00”&lt;BR /&gt;Roof 77’-0”&lt;BR /&gt;&lt;BR /&gt;</description>
      <pubDate>Fri, 09 Mar 2018 08:02:52 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7840387#M240448</guid>
      <dc:creator>Corsten.Au</dc:creator>
      <dc:date>2018-03-09T08:02:52Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7913394#M240449</link>
      <description>&lt;P&gt;Hello all,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Back to this subject, as after a lot of tests I cannot find the correct workflow to have my toposurface in the correct level and my building too.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;This is what I do:&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;-Link CAD the floor 1 center to center.&amp;nbsp;&lt;/P&gt;&lt;P&gt;-Rotate the true North.&lt;/P&gt;&lt;P&gt;-Acquire coordinates in order to have the Project Base point with the correct X,Y Coordinates. [exp. X: 1180000000.0 Y:&amp;nbsp;270&lt;SPAN&gt;0000000.0&amp;nbsp; Elev: 0.0 ]&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;&lt;SPAN&gt;- Unclip the Project Base Point and move it in the corner of the building.&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;-I start to model the buiulding in the &lt;STRONG&gt;elevation 0.0&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;-When I finish the building, I &lt;STRONG&gt;Specify Coordinate&lt;/STRONG&gt;s at a Point Command and I give an &lt;STRONG&gt;elevation 615m.&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;so now the Project Base point has the value X:&lt;SPAN&gt;&amp;nbsp;1180000000.0 Y:&amp;nbsp;&lt;/SPAN&gt;&lt;SPAN&gt;270&lt;/SPAN&gt;&lt;SPAN&gt;0000000.0 Elev: 615.0&amp;nbsp;&lt;/SPAN&gt;&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;&lt;SPAN&gt;the Survey&amp;nbsp;point has the value X:&amp;nbsp;0.0 Y:&amp;nbsp;0.0&amp;nbsp;Elev: 0.0&amp;nbsp;&lt;/SPAN&gt;&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;-Now I want to create the toposurface. So I link the CAD [ the contours of my toposurface are between 618m - 613m].&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;If you see the attachment you will notice that the toposurface is higher than my building. This is what I cannot understand. As I moved my building in the 'correct elevation' why the toposurface still remains higher?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Your ideas could help me..&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank you in advance!&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 06 Apr 2018 09:22:24 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7913394#M240449</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-04-06T09:22:24Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7913936#M240450</link>
      <description>&lt;P&gt;Well I also noticed that when I put&amp;nbsp;an Annotate Spot Coordinate with a &lt;STRONG&gt;Cordinate Origin 'Project Base point&lt;/STRONG&gt;', the building is in the elevation 0.0 and the toposurface in the elevation 615.0&lt;/P&gt;&lt;P&gt;.&lt;/P&gt;&lt;P&gt;If I change the Coordinate Origin to the 'Survey Point'. The building is in the elevation 615.0&amp;nbsp; and the toposurface in the double distance 1230.0.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 06 Apr 2018 13:19:33 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7913936#M240450</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-04-06T13:19:33Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7940201#M240451</link>
      <description>&lt;P&gt;Can anyone help me to understand this workflow?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank you in advance!&lt;/P&gt;</description>
      <pubDate>Wed, 18 Apr 2018 06:12:56 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7940201#M240451</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-04-18T06:12:56Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7940439#M240452</link>
      <description>&lt;P&gt;&lt;SPAN&gt;You&amp;nbsp;almost have it.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;You&amp;nbsp;did draw the terrain/imported your CAD in&amp;nbsp;&lt;SPAN class="s-rg-t"&gt;Elev=&lt;/SPAN&gt;&amp;nbsp;0.0m Project Coordinates.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;When you changed your project Base Point to&amp;nbsp;&lt;SPAN class="s-rg-t"&gt;Elev=615.0m&lt;/SPAN&gt;, you moved your CAD 615m too high.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;If you already created your terrain, you would just displace it in an Elevation&amp;nbsp;(if you can't check if it is&amp;nbsp;&lt;SPAN class="s-bl-t"&gt;pinned&lt;/SPAN&gt;).&lt;/SPAN&gt;&lt;BR /&gt;&lt;BR /&gt;&lt;SPAN&gt;When you import a CAD, it is always in related to a Level.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;You can select it and in the properties adapt the elevation or you can create a new level in&amp;nbsp;&lt;SPAN class="s-rg-t"&gt;Elev=0.0&lt;/SPAN&gt;, an assign the CAD files to this level.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;Because of that&amp;nbsp;(we rarely want to have a level in&amp;nbsp;elev&amp;nbsp;0.0 in our&amp;nbsp;mode)&amp;nbsp;it&amp;nbsp;is sometimes a&amp;nbsp;good&amp;nbsp;strategy to&amp;nbsp;have&amp;nbsp;a separated&amp;nbsp;rvt&amp;nbsp;file with terrain&amp;nbsp;(but if your project is simple, I don't recommend it).&lt;/SPAN&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 18 Apr 2018 07:58:38 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7940439#M240452</guid>
      <dc:creator>M_Perez</dc:creator>
      <dc:date>2018-04-18T07:58:38Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7941688#M240453</link>
      <description>&lt;P&gt;This might help:&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;A href="http://help.autodesk.com/view/RVT/2019/ENU/?guid=GUID-B73E0D49-3330-4876-B8BD-7C23B9340626" target="_blank"&gt;http://help.autodesk.com/view/RVT/2019/ENU/?guid=GUID-B73E0D49-3330-4876-B8BD-7C23B9340626&lt;/A&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 18 Apr 2018 14:37:33 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7941688#M240453</guid>
      <dc:creator>loboarch</dc:creator>
      <dc:date>2018-04-18T14:37:33Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7944688#M240454</link>
      <description>&lt;P&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/2681003"&gt;@M_Perez&lt;/a&gt;&amp;nbsp;,&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Hello, thank you all for your answers.&lt;/P&gt;&lt;P&gt;I absolutely miss something...&lt;STRONG&gt;In the Autocad&lt;/STRONG&gt; I have in one plan both the terrain and the building. If I go in an elevation the &lt;STRONG&gt;building&lt;/STRONG&gt; has a &lt;STRONG&gt;position Z: 0.0&lt;/STRONG&gt; and the &lt;STRONG&gt;terrain&lt;/STRONG&gt; has a &lt;STRONG&gt;Position Z:&amp;nbsp;between 618m - 613m.&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;&amp;nbsp;&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;So in Revit when I import this CAD link in elevation 0.0 I have the link- building in 0.0 and the link- terrain much higher (in 615m).&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;If I relocate the project or give an elevation value in the project base point [615 m]&amp;nbsp; the distance between the building and the terrain continues to exist. So my building doen't reach the terrain.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;(I know that a solution is to move the terrain lower...but I want to learn the correct workflow in order to create the terrain in the correct elevation in which my building is located)&lt;/P&gt;&lt;P&gt;.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank you in advance!&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 19 Apr 2018 12:53:17 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7944688#M240454</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-04-19T12:53:17Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7944810#M240455</link>
      <description>&lt;P&gt;&lt;SPAN&gt;Could it be that the terrain an&amp;nbsp;xRef&amp;nbsp;in&amp;nbsp;Autocad&amp;nbsp;is?&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;&lt;BR /&gt;&lt;SPAN&gt;I've never tried&amp;nbsp;to&amp;nbsp;import&amp;nbsp;a&amp;nbsp;file&amp;nbsp;with&amp;nbsp;xRefs, I would&amp;nbsp;recomend you&amp;nbsp;in that case to&amp;nbsp;import&amp;nbsp;the terrain&amp;nbsp;file&amp;nbsp;and the&amp;nbsp;building&amp;nbsp;separated and see what&amp;nbsp;happens.&lt;/SPAN&gt;&lt;/P&gt;</description>
      <pubDate>Thu, 19 Apr 2018 13:24:39 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7944810#M240455</guid>
      <dc:creator>M_Perez</dc:creator>
      <dc:date>2018-04-19T13:24:39Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7945054#M240456</link>
      <description>&lt;P&gt;Hmm question... In AutoCAD file the 3D contours should be designed in the real height or in 0.0 ?&amp;nbsp;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 19 Apr 2018 14:38:22 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7945054#M240456</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-04-19T14:38:22Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7945105#M240457</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/2681003"&gt;@M_Perez&lt;/a&gt;&lt;SPAN&gt;&amp;nbsp;&lt;/SPAN&gt;wrote:&lt;BR /&gt;&lt;P&gt;&lt;SPAN&gt;When you import a CAD, it is always in related to a Level.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;You can select it and in the properties adapt the elevation or you can create a new level in&amp;nbsp;&lt;SPAN class="s-rg-t"&gt;Elev=0.0&lt;/SPAN&gt;, an assign the CAD files to this level.&lt;/SPAN&gt;&lt;/P&gt;&lt;/BLOCKQUOTE&gt;&lt;P&gt;&lt;SPAN&gt;If&amp;nbsp;you&amp;nbsp;import your CAD file in&amp;nbsp;Elev&amp;nbsp;=&amp;nbsp;0.0 or move it there, then&amp;nbsp;is&amp;nbsp;real elevation right.&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;But if you place them in your project +0.0 then you have to draw them in project elevation.&lt;/SPAN&gt;&lt;/P&gt;</description>
      <pubDate>Thu, 19 Apr 2018 14:49:05 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7945105#M240457</guid>
      <dc:creator>M_Perez</dc:creator>
      <dc:date>2018-04-19T14:49:05Z</dc:date>
    </item>
    <item>
      <title>Re: Relocate the project!</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7946913#M240458</link>
      <description>&lt;P&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/2681003"&gt;@M_Perez&lt;/a&gt;&amp;nbsp;,&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I import/link the CAD in level 1 (which is the 0.0), I check also this from the properties:&lt;/P&gt;&lt;P&gt;Base Level: Level 1&amp;nbsp;&lt;/P&gt;&lt;P&gt;Base offset 0.0.&lt;/P&gt;&lt;P&gt;As I said, the CAD file contains both the building and the Terrain, you will notice in the attachment that the building is much lower than Terrain.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;In revit the building that I have designed is in the lower part of 3D with the CAD building.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;So now when I change the Project base point in elevation 615.0&amp;nbsp; / or relocate the project my building and the terrain have always this distance.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;P.S. In AutoCAD I need to have polyline or 3Dpolyline?&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 20 Apr 2018 06:10:31 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/relocate-the-project/m-p/7946913#M240458</guid>
      <dc:creator>mairh_tsek</dc:creator>
      <dc:date>2018-04-20T06:10:31Z</dc:date>
    </item>
  </channel>
</rss>

