<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Multiple revision numbering in Revit Architecture Forum</title>
    <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11021851#M238842</link>
    <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/12205117"&gt;@dtobitt&lt;/a&gt;&amp;nbsp;wrote:&lt;BR /&gt;
&lt;P&gt;That looks like it would solve our problems, I still don't seem to be able to find it, which tab is it under please?&amp;nbsp; The search doesn't offer any assistance for 'revision properties' either.&amp;nbsp; Much appreciated, Donna&lt;/P&gt;
&lt;HR /&gt;&lt;/BLOCKQUOTE&gt;
&lt;P&gt;Tabs are shown in the screenshots: Fields tab and Sorting/grouping tab.&lt;/P&gt;</description>
    <pubDate>Tue, 22 Mar 2022 16:40:29 GMT</pubDate>
    <dc:creator>ToanDN</dc:creator>
    <dc:date>2022-03-22T16:40:29Z</dc:date>
    <item>
      <title>Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/7870969#M238821</link>
      <description>&lt;P&gt;Hi&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Is there a way to use multiple revision numbering system?&amp;nbsp; What I mean is for every stage of a project to have a diferent prefix on revision. Preliminary as P01, P02, P03 and so on, than for Tender: T01,T02,T03 and so on, and than for Construction: C01, C02, C03....I've tried to use numeric with prefix and alfanumeric as fixed figures but that work only with 2 systems and at first place alfanumeric have to be used othervise revision shedule is not in the right order.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 21 Mar 2018 10:46:10 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/7870969#M238821</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2018-03-21T10:46:10Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/7876076#M238822</link>
      <description>&lt;P&gt;You can try it by sacrificing a field in the Rev schedule. Then you can combine two field to create your new rev number (here issued by and revision number).&lt;/P&gt;
&lt;P&gt;In this case I sorted on date, requiring to use a proper format&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Revs.png" style="width: 705px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/479167iD9A666EADAEBC5EF/image-size/large?v=v2&amp;amp;px=999" role="button" title="Revs.png" alt="Revs.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 22 Mar 2018 18:05:01 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/7876076#M238822</guid>
      <dc:creator>L.Maas</dc:creator>
      <dc:date>2018-03-22T18:05:01Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8032436#M238823</link>
      <description>&lt;P&gt;Hello,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Is there a way were i can number my revisions 1.1,1.2,1.3,1.4 etc &amp;amp; also having 2.0,2.1,2.2 then 3.0,3.1,3.2. all on the same sheet. We are using a CDE Central data system that sends drawings that have been reviewed for changes to the back of the line and then moves them up - example first drawing P1.0 then all team comment revisions 1.1,1.2 until the client reviews them and requests changes. Once those changes are done and we up-load to the CDE it numbers it as series 2.0, this drawing can theoretically go can go to the back of the line again once the client asks for more changes ie., 3.0&amp;nbsp; then 4.0 &amp;amp; so on until the client is satisfied all it's requirements are meet.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 29 May 2018 14:38:23 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8032436#M238823</guid>
      <dc:creator>markcpduffy</dc:creator>
      <dc:date>2018-05-29T14:38:23Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8037932#M238824</link>
      <description>&lt;P&gt;I still need all columns. so it won't work for me. Anyway thank you for advise.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 31 May 2018 12:47:51 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8037932#M238824</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2018-05-31T12:47:51Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8038286#M238825</link>
      <description>&lt;P&gt;@Anonymous&amp;nbsp; ,&amp;nbsp;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/1792631"&gt;@markcpduffy&lt;/a&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Have you tried&amp;nbsp;establishing a custom sequence with a custom prefix in this dialog box?&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="2018-05-31_10-31-38.jpg" style="width: 619px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/507020i1425057DDDF67A23/image-size/large?v=v2&amp;amp;px=999" role="button" title="2018-05-31_10-31-38.jpg" alt="2018-05-31_10-31-38.jpg" /&gt;&lt;/span&gt;&lt;/P&gt;</description>
      <pubDate>Thu, 31 May 2018 14:36:11 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8038286#M238825</guid>
      <dc:creator>Alfredo_Medina</dc:creator>
      <dc:date>2018-05-31T14:36:11Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8038578#M238826</link>
      <description>&lt;P&gt;It works for one drawing, not for whole project because one drawing can have revisions sequence P01, P02, P03, T01, T02 while second P01, T01, T02, T03.&lt;/P&gt;</description>
      <pubDate>Thu, 31 May 2018 16:08:58 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8038578#M238826</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2018-05-31T16:08:58Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8038599#M238827</link>
      <description>&lt;P&gt;Have you tried the option of numbering revisions "per sheet"? instead of "per project"?&lt;/P&gt;</description>
      <pubDate>Thu, 31 May 2018 16:15:16 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8038599#M238827</guid>
      <dc:creator>Alfredo_Medina</dc:creator>
      <dc:date>2018-05-31T16:15:16Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8041792#M238828</link>
      <description>&lt;P&gt;Alfredo,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;i have tried by sheet. The alphanumeric sequencing in by sheet will only let you do as follows fr first numbers 1.0, 2.0,3.0 just like letters A,B,C. I &amp;nbsp;Need to find a way were I can make both numbers rise consecutivaly as well. Example 1.0,1.1,1.2 then 2.0,2.1,2.2 then 3,4,5 etc. For both numbers. At this stage I am not sure it is possible in Revit. If you could try what you mean and if it works I would be grateful for any advice.&lt;/P&gt;&lt;P&gt;regards&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Mark&lt;/P&gt;</description>
      <pubDate>Fri, 01 Jun 2018 18:39:19 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8041792#M238828</guid>
      <dc:creator>markcpduffy</dc:creator>
      <dc:date>2018-06-01T18:39:19Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8041873#M238829</link>
      <description>&lt;P&gt;Estimate the possible numbers of revisions and add them to the Alphanumeric list.&amp;nbsp; Then add them all in your Revisions list.&amp;nbsp; When you need to place the actual Revision clouds or check the Revisions box for Sheets, you can choose what already listed there.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Capture.PNG" style="width: 999px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/507640i00BE07DB115DEE54/image-size/large?v=v2&amp;amp;px=999" role="button" title="Capture.PNG" alt="Capture.PNG" /&gt;&lt;/span&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Capture1.PNG" style="width: 999px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/507641i569E6EC88E02F281/image-size/large?v=v2&amp;amp;px=999" role="button" title="Capture1.PNG" alt="Capture1.PNG" /&gt;&lt;/span&gt;&lt;/P&gt;</description>
      <pubDate>Fri, 01 Jun 2018 19:27:23 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8041873#M238829</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2018-06-01T19:27:23Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8069276#M238830</link>
      <description>Thanks,&lt;BR /&gt;&lt;BR /&gt;Much appreciated.&lt;BR /&gt;</description>
      <pubDate>Thu, 14 Jun 2018 19:03:23 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8069276#M238830</guid>
      <dc:creator>markcpduffy</dc:creator>
      <dc:date>2018-06-14T19:03:23Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8802342#M238831</link>
      <description>&lt;P&gt;Hi &lt;A class="pop-username" href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/1014093" target="_blank" rel="noopener"&gt;L.Maas,&lt;/A&gt;&lt;/P&gt;
&lt;P&gt;I just ran into the same problem in Revit 2018 and was wondering if there is any easier solution to that? We are now goint construction stage and need to continue the revisions from P01, P02, P03, etc, to C01, C02, C03, etc.&lt;/P&gt;
&lt;P&gt;I didn't quite understand the method you suggested. So, I went to edit the title block and went into the revision schedule, combined the 'Issued by' with the 'Revision Number', but then what? I reloaded the title block into the project but couldn't see any difference anywhere.&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Can you explain a bit more the method?&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Thanks,&lt;/P&gt;
&lt;P&gt;Maria&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Mon, 20 May 2019 15:29:23 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/8802342#M238831</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2019-05-20T15:29:23Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/9318502#M238832</link>
      <description>&lt;P&gt;You can actually add revision sequence as a field and have it sort by that then hide it in the schedule table. Save you from having to go by year, date, month convention.&lt;/P&gt;</description>
      <pubDate>Fri, 14 Feb 2020 13:10:06 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/9318502#M238832</guid>
      <dc:creator>nathaniel.mcmahon</dc:creator>
      <dc:date>2020-02-14T13:10:06Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10714660#M238833</link>
      <description>&lt;P&gt;Has anyone solved this issue yet? How do we get the schedule table to pick either P01, P02 then C01 for sheet Number 1 then PO1, C01 C02 for sheet Number 2?&lt;/P&gt;</description>
      <pubDate>Tue, 26 Oct 2021 14:26:49 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10714660#M238833</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-10-26T14:26:49Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10873550#M238834</link>
      <description>&lt;P&gt;Can you please brief the process of it?&lt;/P&gt;&lt;P&gt;Thanks in advance&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 12 Jan 2022 07:19:37 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10873550#M238834</guid>
      <dc:creator>paras.shahTEK7X</dc:creator>
      <dc:date>2022-01-12T07:19:37Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10873554#M238835</link>
      <description>&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Can you please elaborate on the process used for getting this done. Also are we compromising on the clouds related to these revisions? Its require urgently, if you can help us, it will be really appreciated.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 12 Jan 2022 07:23:05 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10873554#M238835</guid>
      <dc:creator>YashshahEV</dc:creator>
      <dc:date>2022-01-12T07:23:05Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10875716#M238836</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/9012096"&gt;@YashshahEV&lt;/a&gt;&amp;nbsp;wrote:&lt;BR /&gt;
&lt;P&gt;Hi,&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Can you please elaborate on the process used for getting this done. Also are we compromising on the clouds related to these revisions? Its require urgently, if you can help us, it will be really appreciated.&amp;nbsp;&lt;/P&gt;
&lt;HR /&gt;&lt;/BLOCKQUOTE&gt;
&lt;P&gt;This is extremely easy in Revit 2022.&amp;nbsp; You can have as many Sets as you wish.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ToanDN_0-1642031243832.png" style="width: 999px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1010553i5FFBE0ECF2F5CF41/image-size/large?v=v2&amp;amp;px=999" role="button" title="ToanDN_0-1642031243832.png" alt="ToanDN_0-1642031243832.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ToanDN_1-1642031273483.png" style="width: 999px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1010554i98B5BB1B5F99B254/image-size/large?v=v2&amp;amp;px=999" role="button" title="ToanDN_1-1642031273483.png" alt="ToanDN_1-1642031273483.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ToanDN_0-1642031552107.png" style="width: 400px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1010556i82F48764ECE1063C/image-size/medium?v=v2&amp;amp;px=400" role="button" title="ToanDN_0-1642031552107.png" alt="ToanDN_0-1642031552107.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 12 Jan 2022 23:52:34 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/10875716#M238836</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2022-01-12T23:52:34Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11010904#M238837</link>
      <description>&lt;P&gt;I've just upgraded our model to 2022 to try this, however, it did seem to go well with P1, P2 then T1, T2 but when I put C1, C2, it puts it at the bottom, i.e. in alphabetical order rather than date order, is there a way around this anyone know?&amp;nbsp; At the moment I've put xC1 to make it go to the top of the list&lt;/P&gt;</description>
      <pubDate>Thu, 17 Mar 2022 09:51:20 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11010904#M238837</guid>
      <dc:creator>dtobitt</dc:creator>
      <dc:date>2022-03-17T09:51:20Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11012254#M238838</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/12205117"&gt;@dtobitt&lt;/a&gt;&amp;nbsp;wrote:&lt;BR /&gt;
&lt;P&gt;I've just upgraded our model to 2022 to try this, however, it did seem to go well with P1, P2 then T1, T2 but when I put C1, C2, it puts it at the bottom, i.e. in alphabetical order rather than date order, is there a way around this anyone know?&amp;nbsp; At the moment I've put xC1 to make it go to the top of the list&lt;/P&gt;
&lt;HR /&gt;&lt;/BLOCKQUOTE&gt;
&lt;P&gt;Sort the revision schedule by Sequence.&lt;/P&gt;</description>
      <pubDate>Thu, 17 Mar 2022 18:38:55 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11012254#M238838</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2022-03-17T18:38:55Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11015069#M238839</link>
      <description>Any possibility of a screenshot of that option, I don't seem to have one in the sheet issues/revisions schedule?&lt;BR /&gt;Cheers&lt;BR /&gt;</description>
      <pubDate>Fri, 18 Mar 2022 22:08:06 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11015069#M238839</guid>
      <dc:creator>dtobitt</dc:creator>
      <dc:date>2022-03-18T22:08:06Z</dc:date>
    </item>
    <item>
      <title>Re: Multiple revision numbering</title>
      <link>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11015076#M238840</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/12205117"&gt;@dtobitt&lt;/a&gt;&amp;nbsp;wrote:&lt;BR /&gt;Any possibility of a screenshot of that option, I don't seem to have one in the sheet issues/revisions schedule?&lt;BR /&gt;Cheers&lt;BR /&gt;&lt;HR /&gt;&lt;/BLOCKQUOTE&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ToanDN_0-1647641428720.png" style="width: 600px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1038216i725B426A7D7A58EF/image-size/medium?v=v2&amp;amp;px=400" role="button" title="ToanDN_0-1647641428720.png" alt="ToanDN_0-1647641428720.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="ToanDN_1-1647641447712.png" style="width: 600px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1038217i0FEDCBA5D76A4C2A/image-size/medium?v=v2&amp;amp;px=400" role="button" title="ToanDN_1-1647641447712.png" alt="ToanDN_1-1647641447712.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 18 Mar 2022 22:10:50 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-architecture-forum/multiple-revision-numbering/m-p/11015076#M238840</guid>
      <dc:creator>ToanDN</dc:creator>
      <dc:date>2022-03-18T22:10:50Z</dc:date>
    </item>
  </channel>
</rss>

