<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: How to access/edit existing Schedule data cells with the API? in Revit API Forum</title>
    <link>https://forums.autodesk.com/t5/revit-api-forum/how-to-access-edit-existing-schedule-data-cells-with-the-api/m-p/7311208#M56631</link>
    <description>&lt;P&gt;If this can be done through the standard Revit UI even better, our office has just been numbering hundreds of sheets one by one on schedules for years now.&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Fri, 18 Aug 2017 14:26:21 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2017-08-18T14:26:21Z</dc:date>
    <item>
      <title>How to access/edit existing Schedule data cells with the API?</title>
      <link>https://forums.autodesk.com/t5/revit-api-forum/how-to-access-edit-existing-schedule-data-cells-with-the-api/m-p/7308857#M56630</link>
      <description>&lt;P&gt;Ideally I would like to be able to create a Schedule from scratch with the four columns I want, but that part can be done with the Revit UI almost as easily. The thing I would like to do is be able to number sheets in a Sheet Schedule so that they are then ordered by those numbers. Basically sheets numbered Txxx come first, then Zxxx, then ENxxx and so on. I can write the logic to order them the way we need them, but I just don't know how to access and edit the text within the cells of the schedule to do this. Also if a sheet gets added to the project, I would like the schedule to correctly number it according to these rules. Not sure if that part is doable, I could always just create a new schedule if sheets are added.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I attached an image. So right now we have to manually enter the numbers in the "Sheet # in contract" column. I would like a macro that looks at the sheet number column, orders all of them according to our conventions(in this example T sheets first, A second, S third etc), numbers them once they are ordered, and then fills those numbers in the "Sheet # in contract" column. So yea basically I would like to know how to access and edit that raw text in those data cells.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 17 Aug 2017 17:59:47 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-api-forum/how-to-access-edit-existing-schedule-data-cells-with-the-api/m-p/7308857#M56630</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-08-17T17:59:47Z</dc:date>
    </item>
    <item>
      <title>Re: How to access/edit existing Schedule data cells with the API?</title>
      <link>https://forums.autodesk.com/t5/revit-api-forum/how-to-access-edit-existing-schedule-data-cells-with-the-api/m-p/7311208#M56631</link>
      <description>&lt;P&gt;If this can be done through the standard Revit UI even better, our office has just been numbering hundreds of sheets one by one on schedules for years now.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 18 Aug 2017 14:26:21 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-api-forum/how-to-access-edit-existing-schedule-data-cells-with-the-api/m-p/7311208#M56631</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-08-18T14:26:21Z</dc:date>
    </item>
  </channel>
</rss>

