<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: How accurate are the times shown in toolpath statistics? in PowerMill Forum</title>
    <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7405748#M25683</link>
    <description>&lt;P&gt;I have HAAS VF2&amp;nbsp; - when PM say 4 hours - it is always be as 4 hr +5 min&lt;/P&gt;&lt;P&gt;(this 5 min added when operator is paused program for check how it work)&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;3 years im working near HAAS VF2 - it is always say correct time!&lt;/P&gt;&lt;P&gt;im loaded into him NC programs 40 Megabytes - and all is ok&lt;/P&gt;&lt;P&gt;but all speed settings must be 100% of course&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;also im sometime make programs for Dekkel Maho 50V&lt;/P&gt;&lt;P&gt;it is always say incorrect time - from +30 to +80 % much more time.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;So - i think it depends from your CNC controller and machine tool.&lt;/P&gt;</description>
    <pubDate>Mon, 25 Sep 2017 08:35:57 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2017-09-25T08:35:57Z</dc:date>
    <item>
      <title>How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7402589#M25680</link>
      <description>&lt;P&gt;Does anyone know how accurate the toolpath statistics time calculations are? I ran a program today that said it would take about 4 hours and it ended up running for at least double that? Am I doing something wrong or is there a setting somewhere I need to change? Any insights would be much appreciated.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Regards&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Liam&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 22 Sep 2017 18:58:44 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7402589#M25680</guid>
      <dc:creator>liam.carr59V7G</dc:creator>
      <dc:date>2017-09-22T18:58:44Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7402624#M25681</link>
      <description>&lt;P&gt;Powermill doesn't take into consideration the slowdowns when it goes into a corner, that time is based on continuous cutting&amp;nbsp;feedrate which we never get on our machines&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;I always multiply the actual time by 1 1/2 times to get a more accurate&amp;nbsp;time.&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;So in your case, if you have a 4 hr prgm&amp;nbsp;I would multiply&amp;nbsp;4 by 1.5 which would give us a more realistic time of 6 hrs&lt;/P&gt;</description>
      <pubDate>Fri, 22 Sep 2017 19:16:47 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7402624#M25681</guid>
      <dc:creator>iamcdn79</dc:creator>
      <dc:date>2017-09-22T19:16:47Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7402727#M25682</link>
      <description>&lt;P&gt;I am actually sitting here tweaking my time macro right now. I took the actual time for a few rouging toolpaths, and actual time for a few finishers and I will find a factor for each of them to get a good average and have two separate macros&lt;/P&gt;</description>
      <pubDate>Fri, 22 Sep 2017 19:54:53 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7402727#M25682</guid>
      <dc:creator>TK.421</dc:creator>
      <dc:date>2017-09-22T19:54:53Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7405748#M25683</link>
      <description>&lt;P&gt;I have HAAS VF2&amp;nbsp; - when PM say 4 hours - it is always be as 4 hr +5 min&lt;/P&gt;&lt;P&gt;(this 5 min added when operator is paused program for check how it work)&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;3 years im working near HAAS VF2 - it is always say correct time!&lt;/P&gt;&lt;P&gt;im loaded into him NC programs 40 Megabytes - and all is ok&lt;/P&gt;&lt;P&gt;but all speed settings must be 100% of course&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;also im sometime make programs for Dekkel Maho 50V&lt;/P&gt;&lt;P&gt;it is always say incorrect time - from +30 to +80 % much more time.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;So - i think it depends from your CNC controller and machine tool.&lt;/P&gt;</description>
      <pubDate>Mon, 25 Sep 2017 08:35:57 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7405748#M25683</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2017-09-25T08:35:57Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406054#M25684</link>
      <description>&lt;P&gt;Does anybody know what value Powermill puts in for Rapid moves?&lt;/P&gt;</description>
      <pubDate>Mon, 25 Sep 2017 11:21:34 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406054#M25684</guid>
      <dc:creator>Pijetro</dc:creator>
      <dc:date>2017-09-25T11:21:34Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406078#M25685</link>
      <description>You are able to find all parameters under help-documentation-reference. There is something in there for rapid moves&lt;BR /&gt;</description>
      <pubDate>Mon, 25 Sep 2017 11:37:47 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406078#M25685</guid>
      <dc:creator>TK.421</dc:creator>
      <dc:date>2017-09-25T11:37:47Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406146#M25686</link>
      <description>&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Capture.PNG" style="width: 388px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/404996iDB83227125FCA8E3/image-size/large?v=v2&amp;amp;px=999" role="button" title="Capture.PNG" alt="Capture.PNG" /&gt;&lt;/span&gt;&lt;/P&gt;</description>
      <pubDate>Mon, 25 Sep 2017 12:13:04 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406146#M25686</guid>
      <dc:creator>TK.421</dc:creator>
      <dc:date>2017-09-25T12:13:04Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406360#M25687</link>
      <description>&lt;P&gt;Thanks...&lt;/P&gt;
&lt;P&gt;That's a given..&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;However, my skim moves are calculated as G1s...I use those when needed, however, I default to Rapid moves, since my post creates G00 moves for them.&lt;/P&gt;
&lt;P&gt;My Rapid moves on my mills are only at 750 IN/MIN..If I could somehow tell Powermill that all dotted red lines have a value of 750 IN/MIN, then except for machine dwell, Powermill calculates to within 10% for most of my needs..&lt;/P&gt;</description>
      <pubDate>Mon, 25 Sep 2017 13:29:00 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406360#M25687</guid>
      <dc:creator>Pijetro</dc:creator>
      <dc:date>2017-09-25T13:29:00Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406423#M25688</link>
      <description>&lt;P&gt;I found it under the reference docs:&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="Capture.PNG" style="width: 705px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/405033i0C80838DF83E0946/image-size/large?v=v2&amp;amp;px=999" role="button" title="Capture.PNG" alt="Capture.PNG" /&gt;&lt;/span&gt;&lt;/P&gt;</description>
      <pubDate>Mon, 25 Sep 2017 13:42:15 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7406423#M25688</guid>
      <dc:creator>TK.421</dc:creator>
      <dc:date>2017-09-25T13:42:15Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7409024#M25689</link>
      <description>&lt;P&gt;Same for me. Machining time vs calculated machining time has a lot of difference for me. I guess that&amp;nbsp; tool changes, spindle speed up or slowing down, slowing down in corners, ... are all steps that PM doesn't add to the machining time of the project.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;This could easily be solved when we would have a box to fill in the tool change time, spindle speed up time, etc....&lt;/P&gt;</description>
      <pubDate>Tue, 26 Sep 2017 09:58:36 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7409024#M25689</guid>
      <dc:creator>GlennM.MCAM</dc:creator>
      <dc:date>2017-09-26T09:58:36Z</dc:date>
    </item>
    <item>
      <title>Re: How accurate are the times shown in toolpath statistics?</title>
      <link>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7409858#M25690</link>
      <description>&lt;P&gt;I found on the former Delcam forum some piece of code to generate +/- correct times, which you should run before generating the setup sheet in order to get imes in HH:MM:SS :&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;PRE&gt;FOREACH ent IN folder("NCProgram\Cincinnati") {
            ACTIVATE NCProgram $ent.Name
            ACTIVATE WORKPLANE FROMENTITY NCProgram ;
            ROTATE TRANSFORM TOP
            KEEP SNAPSHOT NCPROGRAM ; CURRENT
            TEXTINFO ACCEPT
            UNDRAW TRANSFORM
			$nombre = $nombre +1
			REAL $Time = 0
			$Time = $Time + $entity('ncprogram',$ent.Name).statistics.LeadsandLinks.Times.plunge
				$Time = $Time + $entity('ncprogram',$ent.Name).statistics.LeadsandLinks.Times.ramp
				$Time = $Time + $entity('ncprogram',$ent.Name).statistics.LeadsandLinks.Times.rapid
				$Time = $Time + $entity('ncprogram',$ent.Name).statistics.LeadsandLinks.Times.others
				$Time = $Time + $entity('ncprogram',$ent.Name).statistics.cuttingmoves.Times.arcs
				$Time = $Time + $entity('ncprogram',$ent.Name).statistics.cuttingmoves.Times.linear
				// Include the correction factor
				$Time = $Time*$CorrectionFactor
				$temps = $temps + $Time
				$Time = 0&lt;/PRE&gt;
&lt;P&gt;If you add a test with the tool number (same or not) at every toolpath, you can add the tool change's duration at every tool change, but it's definetly machine dependent.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;I don't see other ways to estimate the accelerations/decelerations than counting the leads and links and applying some correction factors according to the machine and the type of&amp;nbsp;toolpath and the difference between machining feeds and leads/links feeds ...&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;A lot of work, but the result could be +/- correct at the end...&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Olivier&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 26 Sep 2017 14:23:06 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/powermill-forum/how-accurate-are-the-times-shown-in-toolpath-statistics/m-p/7409858#M25690</guid>
      <dc:creator>NanchenO</dc:creator>
      <dc:date>2017-09-26T14:23:06Z</dc:date>
    </item>
  </channel>
</rss>

