    <title>topic Fusion miscalculated duration of CAM operation in Fusion Support Forum</title>
    <link>https://forums.autodesk.com/t5/fusion-support-forum/fusion-miscalculated-duration-of-cam-operation/m-p/13988701#M213468</link>
    <description>&lt;P&gt;Hi realized that Fusion is incorrectly calculating the duration of CAM operations when utilizing inch tooling in a metric file. I ran the simulation and saw that the speed used was the inch feed rate number as mm/rev.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I changed the tool to metric and the duration calculation makes sense.&lt;/P&gt;&lt;P&gt;I am running the lated version of Mac OS and Fusion360&lt;/P&gt;</description>
    <pubDate>Sat, 24 Jan 2026 01:49:47 GMT</pubDate>
    <dc:creator>WestCoastRCWorks</dc:creator>
    <dc:date>2026-01-24T01:49:47Z</dc:date>
    <item>
      <title>Fusion miscalculated duration of CAM operation</title>
      <link>https://forums.autodesk.com/t5/fusion-support-forum/fusion-miscalculated-duration-of-cam-operation/m-p/13988701#M213468</link>
      <description>&lt;P&gt;Hi realized that Fusion is incorrectly calculating the duration of CAM operations when utilizing inch tooling in a metric file. I ran the simulation and saw that the speed used was the inch feed rate number as mm/rev.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I changed the tool to metric and the duration calculation makes sense.&lt;/P&gt;&lt;P&gt;I am running the lated version of Mac OS and Fusion360&lt;/P&gt;</description>
      <pubDate>Sat, 24 Jan 2026 01:49:47 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/fusion-support-forum/fusion-miscalculated-duration-of-cam-operation/m-p/13988701#M213468</guid>
      <dc:creator>WestCoastRCWorks</dc:creator>
      <dc:date>2026-01-24T01:49:47Z</dc:date>
    </item>
    <item>
      <title>Re: Fusion miscalculated duration of CAM operation</title>
      <link>https://forums.autodesk.com/t5/fusion-support-forum/fusion-miscalculated-duration-of-cam-operation/m-p/13988707#M213469</link>
      <description>&lt;P&gt;I did some more testing and found that when I uncheck "feed per rev" the duration calculation is working.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Sat, 24 Jan 2026 02:08:53 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/fusion-support-forum/fusion-miscalculated-duration-of-cam-operation/m-p/13988707#M213469</guid>
      <dc:creator>WestCoastRCWorks</dc:creator>
      <dc:date>2026-01-24T02:08:53Z</dc:date>
    </item>
  </channel>
</rss>
