<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Target-Batch-Size-2D in FlexSim Forum</title>
    <link>https://forums.autodesk.com/t5/flexsim-forum/target-batch-size-2d/m-p/13572680#M72542</link>
    <description>&lt;P&gt;&lt;I&gt;[ FlexSim 22.1.4 ]&lt;/I&gt;&lt;/P&gt;&lt;DIV class="fr-view clearfix"&gt;
 &lt;P&gt;&lt;span class="lia-inline-image-display-wrapper" image-alt="1692730246302.png"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1519147i66D02E63B0A5D574/image-size/large?v=v2&amp;amp;px=999" role="button" title="1692730246302.png" alt="1692730246302.png" /&gt;&lt;/span&gt;&lt;/P&gt;
 &lt;P&gt;&lt;SPAN id="isPasted" style="color: rgb(55, 65, 81); font-family: Söhne, ui-sans-serif, system-ui, -apple-system, "&gt;Transporter 2 is required to place the products in random quantities (9 or 18) at location O1. After that, Transporter 3 will proceed to move them to the track I have created. However, I am encountering an issue where Transporter 3 is picking up the products first. How should I address this problem?&lt;A rel="noopener noreferrer" href="https://answers.flexsim.com/storage/attachments/72895-input-model-1-2222ab23.fsm" target="_blank"&gt;Input model 1_2222AB23.fsm&lt;/A&gt;&lt;/SPAN&gt;&lt;/P&gt;
&lt;/DIV&gt;</description>
    <pubDate>Tue, 22 Aug 2023 18:55:57 GMT</pubDate>
    <dc:creator>Sawanya_khomsan</dc:creator>
    <dc:date>2023-08-22T18:55:57Z</dc:date>
    <item>
      <title>Target-Batch-Size-2D</title>
      <link>https://forums.autodesk.com/t5/flexsim-forum/target-batch-size-2d/m-p/13572680#M72542</link>
      <description>&lt;P&gt;&lt;I&gt;[ FlexSim 22.1.4 ]&lt;/I&gt;&lt;/P&gt;&lt;DIV class="fr-view clearfix"&gt;
 &lt;P&gt;&lt;span class="lia-inline-image-display-wrapper" image-alt="1692730246302.png"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1519147i66D02E63B0A5D574/image-size/large?v=v2&amp;amp;px=999" role="button" title="1692730246302.png" alt="1692730246302.png" /&gt;&lt;/span&gt;&lt;/P&gt;
 &lt;P&gt;&lt;SPAN id="isPasted" style="color: rgb(55, 65, 81); font-family: Söhne, ui-sans-serif, system-ui, -apple-system, "&gt;Transporter 2 is required to place the products in random quantities (9 or 18) at location O1. After that, Transporter 3 will proceed to move them to the track I have created. However, I am encountering an issue where Transporter 3 is picking up the products first. How should I address this problem?&lt;A rel="noopener noreferrer" href="https://answers.flexsim.com/storage/attachments/72895-input-model-1-2222ab23.fsm" target="_blank"&gt;Input model 1_2222AB23.fsm&lt;/A&gt;&lt;/SPAN&gt;&lt;/P&gt;
&lt;/DIV&gt;</description>
      <pubDate>Tue, 22 Aug 2023 18:55:57 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/flexsim-forum/target-batch-size-2d/m-p/13572680#M72542</guid>
      <dc:creator>Sawanya_khomsan</dc:creator>
      <dc:date>2023-08-22T18:55:57Z</dc:date>
    </item>
    <item>
      <title>Re: Target-Batch-Size-2D</title>
      <link>https://forums.autodesk.com/t5/flexsim-forum/target-batch-size-2d/m-p/13572681#M72543</link>
      <description>&lt;DIV class="fr-view clearfix"&gt;&lt;P&gt;Since the next transport is controlled by port-connection logic I would suggest to activate the batch functionality on the queues and set the batch size from the Process Flow before the forklift starts to move any items.&lt;/P&gt;&lt;P&gt;&lt;A rel="noopener noreferrer" href="https://answers.flexsim.com/storage/attachments/72928-input-model-1-2222ab23-fm.fsm" target="_blank"&gt;input-model-1-2222ab23-fm.fsm&lt;/A&gt;&lt;/P&gt;&lt;P&gt;(I also demonstrate how you can shrink down your Process Flow significantly by handling the different pull types through an item label and by referencing the queues through a group.)&lt;/P&gt;&lt;/DIV&gt;</description>
      <pubDate>Wed, 23 Aug 2023 07:24:30 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/flexsim-forum/target-batch-size-2d/m-p/13572681#M72543</guid>
      <dc:creator>moehlmann_fe</dc:creator>
      <dc:date>2023-08-23T07:24:30Z</dc:date>
    </item>
  </channel>
</rss>

