<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Sequential Order in AutoCAD Map 3D Forum</title>
    <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12985137#M599</link>
    <description>&lt;P&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/1271199"&gt;@ChicagoLooper&lt;/a&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Sorry for not explaining further. Say I have a route the goes 100 miles through multiple parishes/counties and crosses thousands of parcels. I am interested in numbering these parcels (in flow order) to import the dbf in excel to obtain a tract list. Does this make sense? Thanks!&lt;/P&gt;</description>
    <pubDate>Tue, 27 Aug 2024 23:36:22 GMT</pubDate>
    <dc:creator>Land337</dc:creator>
    <dc:date>2024-08-27T23:36:22Z</dc:date>
    <item>
      <title>Sequential Order</title>
      <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12983578#M597</link>
      <description>&lt;P&gt;Is is possible to number tracts along a line in sequential order without having to manually input a value into the attribute table? I have attached a dwg as an example. Any help is much appreciated!&lt;/P&gt;</description>
      <pubDate>Tue, 27 Aug 2024 11:35:41 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12983578#M597</guid>
      <dc:creator>Land337</dc:creator>
      <dc:date>2024-08-27T11:35:41Z</dc:date>
    </item>
    <item>
      <title>Re: Sequential Order</title>
      <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12984196#M598</link>
      <description>&lt;P&gt;&lt;FONT color="#333333"&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/12004906"&gt;@Land337&lt;/a&gt;&amp;nbsp;&lt;/FONT&gt;&lt;/P&gt;
&lt;P&gt;&lt;FONT color="#0000FF"&gt;&lt;EM&gt;&amp;lt;&amp;lt;...&lt;SPAN&gt;in sequential order without having to manually input a value....&amp;gt;&amp;gt;&lt;/SPAN&gt;&lt;/EM&gt;&lt;/FONT&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Why? What purpose would that serve.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;If there's another way to get what you want&amp;nbsp;&lt;STRONG&gt;without&lt;/STRONG&gt; putting it in sequential order then go that route instead.&amp;nbsp; Sequential order might just be a round-a-bout&amp;nbsp;way of doing something when a better way (a more appropriate way) already exists.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;You are have parcel data. Explain the desired result you want then let the forum determine the method to achieve it.&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="St Mary's parish, right? Someone has overwritten some of  your Parcel ID's ." style="width: 834px;"&gt;&lt;img src="https://forums.autodesk.com/t5/image/serverpage/image-id/1402507iF15BC3EC39FC6D9D/image-size/large?v=v2&amp;amp;px=999" role="button" title="101.PNG" alt="St Mary's parish, right? Someone has overwritten some of  your Parcel ID's ." /&gt;&lt;span class="lia-inline-image-caption" onclick="event.preventDefault();"&gt;St Mary's parish, right? Someone has overwritten some of  your Parcel ID's .&lt;/span&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 27 Aug 2024 15:29:32 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12984196#M598</guid>
      <dc:creator>ChicagoLooper</dc:creator>
      <dc:date>2024-08-27T15:29:32Z</dc:date>
    </item>
    <item>
      <title>Re: Sequential Order</title>
      <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12985137#M599</link>
      <description>&lt;P&gt;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/1271199"&gt;@ChicagoLooper&lt;/a&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Sorry for not explaining further. Say I have a route the goes 100 miles through multiple parishes/counties and crosses thousands of parcels. I am interested in numbering these parcels (in flow order) to import the dbf in excel to obtain a tract list. Does this make sense? Thanks!&lt;/P&gt;</description>
      <pubDate>Tue, 27 Aug 2024 23:36:22 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12985137#M599</guid>
      <dc:creator>Land337</dc:creator>
      <dc:date>2024-08-27T23:36:22Z</dc:date>
    </item>
    <item>
      <title>Re: Sequential Order</title>
      <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12985193#M600</link>
      <description>&lt;P&gt;Sorry, but that&amp;nbsp;&lt;EM&gt;STILL&lt;/EM&gt; doesn't clarify the&amp;nbsp; issue. I get that you want to put the parcels in a particular order......but why! Certainly you're not just putting them in order just for the fun it. There's a reason. Correct?&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;For whatever reason you wish to sort, I and many others, wouldn't do it that way. Why? Because it's meaningless. The key is &lt;EM&gt;why do you need to sort&lt;/EM&gt; like that when you can easily isolate parcels? For example, you want to isolate parcels in a defined area. Or isolate parcels will PINs beginning with 987. Or isolate parcels bigger than 2 acres. Or isolate parcels so you can send property owners junk mail. Etc. Etc. Etc.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Yes, I know&amp;nbsp;&lt;EM&gt;I&lt;/EM&gt; &lt;EM&gt;can&lt;/EM&gt; do it in excel, but what good does that do me. So I organize my 'list' of parcels in a specific order, big deal. I'm putting them in order for a reason. What I do with that ordered list I can most likely can do even when it's &lt;EM&gt;not&lt;/EM&gt; in order.....or even do it without putting it in a list to begin with.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Do you know why some PIN numbers have been overwritten? Can you possibly shed some light on that?&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;If it were me, my workflow would be to MapExport the parcels to shapefile then do the sorting in shapefile's dbf because keeping them as AutoCAD polygons is too weak--there's a lot of horsepower when you leverage the dbf. Yes, I know, I know, putting it in sequential order is 'a' solution but it's NOT&amp;nbsp;&lt;EM&gt;the &lt;/EM&gt;solution.&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 28 Aug 2024 00:19:54 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12985193#M600</guid>
      <dc:creator>ChicagoLooper</dc:creator>
      <dc:date>2024-08-28T00:19:54Z</dc:date>
    </item>
    <item>
      <title>Re: Sequential Order</title>
      <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12986066#M601</link>
      <description>&lt;P&gt;MAPEXPORT to 2 fdo files.&amp;nbsp; parcels and line&amp;nbsp; with what OD you desire&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;put the two files in a map and MAPGISOVERLAY INTERSECT to a SDF file&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;The line segments are in sequential order in the data table&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;use the .layer file in a map, the lables are there.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;BTW a fake parcel at the beginning of the line will make 25 be #1 to be correct.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I have to go now.&amp;nbsp; the next step is to tranfer the label data to the polygons.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;What to do when you divide a parcel is another question.&lt;/P&gt;</description>
      <pubDate>Wed, 28 Aug 2024 10:11:00 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12986066#M601</guid>
      <dc:creator>parkr4st</dc:creator>
      <dc:date>2024-08-28T10:11:00Z</dc:date>
    </item>
    <item>
      <title>Re: Sequential Order</title>
      <link>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12986281#M602</link>
      <description>&lt;P&gt;Hi&amp;nbsp;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/59562"&gt;@parkr4st&lt;/a&gt;,&amp;nbsp;&lt;a href="https://forums.autodesk.com/t5/user/viewprofilepage/user-id/12004906"&gt;@Land337&lt;/a&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Are you sure that line segments are in sequential order?&lt;/P&gt;
&lt;P&gt;I've tried this solution (Map 2023), and they are in sequential order from part 2 to part 24, but the 1st segment has id = 25 (last record).&lt;/P&gt;
&lt;P&gt;I haven't tried it on another dataset to confirm this behavior, but your SDF have same problem.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;For next question to transfer this info to parcels, you can MAPIMPORT these segments, and use this code to draw a text in the middle of the segment containing it's&amp;nbsp;curvilinear abscissa along road.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;LI-CODE lang="general"&gt;(vl-load-com)
(defun C:Inc2Poly ( / oPart oPartDxf oRoad oRoadDxf I ssPart PTC dPK lsPK oPK)
  (if (and (setq oPart (car (entsel "\nSelect a cutted part : ")))
	   (setq oPartDxf (entget oPart))
	   (or (= "LINE" (cdr (assoc 0 oPartDxf))) (= "LWPOLYLINE" (cdr (assoc 0 oPartDxf))))
	   (setq oRoad (car (entsel "\nSelect the road : ")))
	   (setq oRoadDxf (entget oRoad))
	   (= "LWPOLYLINE" (cdr (assoc 0 oRoadDxf)))
      )
    (progn
      (setq ssPart (ssget "x" (list (cons 8 (cdr (assoc 8 oPartDxf))) (cons 0 "*LINE"))))
      (setq I 0)
      (repeat (sslength ssPart)
	(setq oPart (ssname ssPart I))
	(setq I (1+ I))
	(setq PTC (vlax-curve-GetPointAtDist oPart (* 0.5 (vlax-curve-GetDistAtParam oPart (vlax-curve-GetEndParam oPart)))))
	(setq dPK (vlax-curve-GetDistAtPoint oRoad PTC))
	(setq lsPK (append lsPK (list (list dPK PTC))))
      )
      (setq lsPK (vl-sort lsPK (function (lambda (e1 e2) (&amp;lt; (car e1) (car e2))))))
      (setq I 0)
      (repeat (length lsPK)
	(setq oPK (nth I lsPK))
	(setq I (1+ I))
	(entmake (list (cons 0  "TEXT")
		       (cons 8 (getvar "CLAYER"))
		       (cons 40 6.0)
		       (cons 10 (cadr oPK))
		       (cons 1 (rtos (car oPK) 2 2))
		       (cons 7 "STANDARD")
		 )
	)
      )
    )
  )
)
&lt;/LI-CODE&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Then with ADEGENLINKS with option Enclosed text, you can transfer this info into parcels.&lt;/P&gt;
&lt;P&gt;Problem can appear if road divides a parcel into more than 2 parts.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 28 Aug 2024 12:08:28 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/autocad-map-3d-forum/sequential-order/m-p/12986281#M602</guid>
      <dc:creator>O_Eckmann</dc:creator>
      <dc:date>2024-08-28T12:08:28Z</dc:date>
    </item>
  </channel>
</rss>

