<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>idea When moving an electrical circuit from panel to panel allow the user to keep or reset the current Phase. en Revit Ideas</title>
    <link>https://forums.autodesk.com/t5/revit-ideas/when-moving-an-electrical-circuit-from-panel-to-panel-allow-the/idi-p/13105923</link>
    <description>&lt;P&gt;Currently, when a circuit not yet linked to a panel is assigned to a switchboard, it is connected to the first available phase.&lt;/P&gt;&lt;P&gt;For example there are 4 outlets being connected to Panel 1, one per group. (Group1@Phase A, Group2@Phase B, Group3@Phase C, Group4@Phase A)&lt;/P&gt;&lt;P&gt;When selecting the 5th outlet and clicking the 'Power' button, it will automatically be assigned to Panel 1 as&amp;nbsp; group5@Phase B.&lt;/P&gt;&lt;P&gt;&lt;BR /&gt;When the circuit is transferred, with the Panel selector in the Ribbon, from one panelboard/switchboard to the other, its phase is kept. So &lt;A href="mailto:Group5@PhaseB" target="_blank"&gt;Group5@Phase B&lt;/A&gt;&amp;nbsp;from Panel 1 transferred to Panel 2 will become&amp;nbsp;&lt;A href="mailto:group1@Phase" target="_blank"&gt;Group1@Phase&lt;/A&gt; B.&lt;BR /&gt;It would be helpful to have an option to choose between: "Reset the Phase assignment to the first available or specific phase" and "Keep the previous phase". This preference should be remembered. This might be a checkbox within the "Modify | Electrical Circuits" status bar as shown in the attachment.&lt;BR /&gt;&lt;BR /&gt;It now can be done by disconnecting the circuit first, which introduces an extra step.&lt;/P&gt;</description>
    <pubDate>Thu, 24 Oct 2024 14:12:55 GMT</pubDate>
    <dc:creator>Edwin.Rense</dc:creator>
    <dc:date>2024-10-24T14:12:55Z</dc:date>
    <item>
      <title>When moving an electrical circuit from panel to panel allow the user to keep or reset the current Phase.</title>
      <link>https://forums.autodesk.com/t5/revit-ideas/when-moving-an-electrical-circuit-from-panel-to-panel-allow-the/idi-p/13105923</link>
      <description>&lt;P&gt;Currently, when a circuit not yet linked to a panel is assigned to a switchboard, it is connected to the first available phase.&lt;/P&gt;&lt;P&gt;For example there are 4 outlets being connected to Panel 1, one per group. (Group1@Phase A, Group2@Phase B, Group3@Phase C, Group4@Phase A)&lt;/P&gt;&lt;P&gt;When selecting the 5th outlet and clicking the 'Power' button, it will automatically be assigned to Panel 1 as&amp;nbsp; group5@Phase B.&lt;/P&gt;&lt;P&gt;&lt;BR /&gt;When the circuit is transferred, with the Panel selector in the Ribbon, from one panelboard/switchboard to the other, its phase is kept. So &lt;A href="mailto:Group5@PhaseB" target="_blank"&gt;Group5@Phase B&lt;/A&gt;&amp;nbsp;from Panel 1 transferred to Panel 2 will become&amp;nbsp;&lt;A href="mailto:group1@Phase" target="_blank"&gt;Group1@Phase&lt;/A&gt; B.&lt;BR /&gt;It would be helpful to have an option to choose between: "Reset the Phase assignment to the first available or specific phase" and "Keep the previous phase". This preference should be remembered. This might be a checkbox within the "Modify | Electrical Circuits" status bar as shown in the attachment.&lt;BR /&gt;&lt;BR /&gt;It now can be done by disconnecting the circuit first, which introduces an extra step.&lt;/P&gt;</description>
      <pubDate>Thu, 24 Oct 2024 14:12:55 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-ideas/when-moving-an-electrical-circuit-from-panel-to-panel-allow-the/idi-p/13105923</guid>
      <dc:creator>Edwin.Rense</dc:creator>
      <dc:date>2024-10-24T14:12:55Z</dc:date>
    </item>
  </channel>
</rss>

