<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>idea DB schedule to be “breakable” to fit in sheets en Revit Ideas</title>
    <link>https://forums.autodesk.com/t5/revit-ideas/db-schedule-to-be-breakable-to-fit-in-sheets/idi-p/6724030</link>
    <description>&lt;P&gt;&lt;SPAN&gt;If a DB has a lot of circuits, say more than 108 circuits, we currently can’t fit a DB schedule properly on a sheet. It spreads out of the title block, then that's it - you can't break down into a few sheets for a single DB.&amp;nbsp;&lt;/SPAN&gt;&lt;/P&gt;</description>
    <pubDate>Fri, 02 Dec 2016 13:59:41 GMT</pubDate>
    <dc:creator>qianr</dc:creator>
    <dc:date>2016-12-02T13:59:41Z</dc:date>
    <item>
      <title>DB schedule to be “breakable” to fit in sheets</title>
      <link>https://forums.autodesk.com/t5/revit-ideas/db-schedule-to-be-breakable-to-fit-in-sheets/idi-p/6724030</link>
      <description>&lt;P&gt;&lt;SPAN&gt;If a DB has a lot of circuits, say more than 108 circuits, we currently can’t fit a DB schedule properly on a sheet. It spreads out of the title block, then that's it - you can't break down into a few sheets for a single DB.&amp;nbsp;&lt;/SPAN&gt;&lt;/P&gt;</description>
      <pubDate>Fri, 02 Dec 2016 13:59:41 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-ideas/db-schedule-to-be-breakable-to-fit-in-sheets/idi-p/6724030</guid>
      <dc:creator>qianr</dc:creator>
      <dc:date>2016-12-02T13:59:41Z</dc:date>
    </item>
  </channel>
</rss>

