<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>idea MEP System graphic overrides in the wrong hierarchy order en Revit Ideas</title>
    <link>https://forums.autodesk.com/t5/revit-ideas/mep-system-graphic-overrides-in-the-wrong-hierarchy-order/idi-p/10701620</link>
    <description>&lt;P&gt;Through a bunch of forum reading and trial and error, I've determine the following to be the hierarchy of how visibility graphic overrides apply, and it seems to hold true from what I can tell (1 is highest priority):&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;1) Linework Tool&lt;/P&gt;&lt;P&gt;2) Override Graphics in View -&amp;gt; By Element -&amp;gt; Halftone&lt;/P&gt;&lt;P&gt;3) Graphic Display Options - Silhouette Edges&lt;/P&gt;&lt;P&gt;4) Override Graphics in View -&amp;gt; By Element&lt;/P&gt;&lt;P&gt;5) View Filters&lt;/P&gt;&lt;P&gt;6) MEP System Graphic Overrides&lt;/P&gt;&lt;P&gt;7) View Depth - Beyond Line Style&lt;/P&gt;&lt;P&gt;&lt;img class="lia-deferred-image lia-image-emoji" src="https://forums.autodesk.com/html/@35E1EB867C0FE4FC18284C52F598D39F/emoticons/1f60e.png" alt=":cara_con_gafas_de_sol:" title=":cara_con_gafas_de_sol:" /&gt; Phasing Graphic Overrides&lt;/P&gt;&lt;P&gt;9) Visibility/Graphic Overrides -&amp;gt; Override Host Layers -&amp;gt; Cut Line Styles&lt;/P&gt;&lt;P&gt;10) Visibility/Graphic Overrides -&amp;gt; Projection/Cut Lines&lt;/P&gt;&lt;P&gt;11) Materials within the wall Family (Cut, Pattern, Colour)&lt;/P&gt;&lt;P&gt;12) Project Object Styles&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;As far as I know the position of MEP overrides isn't formally documented by determined by others through trial and error.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;My problem is the order of items 6, 7, &amp;amp; 8.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I want my pipes and ducts to have a certain look (both link thickness and line type), UNLESS they are below the floor (which in my case should be dashed linetype), and UNLESS they are being demolished (which in my case should be dashed differently than underfloor and thicker lines).&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Currently I am using a combination of worksets and filters to get the desired look because the MEP graphic overrides are killing both phasing and beyond settings.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I propose that items 6 and 8 in the above list be swapped so the new order would be:&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Phasing Graphic Overrides&lt;/P&gt;&lt;P&gt;View Depth - Beyond Line Style&lt;/P&gt;&lt;P&gt;MEP System Graphic Overrides&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;</description>
    <pubDate>Wed, 20 Oct 2021 15:36:13 GMT</pubDate>
    <dc:creator>jcox-arc</dc:creator>
    <dc:date>2021-10-20T15:36:13Z</dc:date>
    <item>
      <title>MEP System graphic overrides in the wrong hierarchy order</title>
      <link>https://forums.autodesk.com/t5/revit-ideas/mep-system-graphic-overrides-in-the-wrong-hierarchy-order/idi-p/10701620</link>
      <description>&lt;P&gt;Through a bunch of forum reading and trial and error, I've determine the following to be the hierarchy of how visibility graphic overrides apply, and it seems to hold true from what I can tell (1 is highest priority):&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;1) Linework Tool&lt;/P&gt;&lt;P&gt;2) Override Graphics in View -&amp;gt; By Element -&amp;gt; Halftone&lt;/P&gt;&lt;P&gt;3) Graphic Display Options - Silhouette Edges&lt;/P&gt;&lt;P&gt;4) Override Graphics in View -&amp;gt; By Element&lt;/P&gt;&lt;P&gt;5) View Filters&lt;/P&gt;&lt;P&gt;6) MEP System Graphic Overrides&lt;/P&gt;&lt;P&gt;7) View Depth - Beyond Line Style&lt;/P&gt;&lt;P&gt;&lt;img class="lia-deferred-image lia-image-emoji" src="https://forums.autodesk.com/html/@35E1EB867C0FE4FC18284C52F598D39F/emoticons/1f60e.png" alt=":cara_con_gafas_de_sol:" title=":cara_con_gafas_de_sol:" /&gt; Phasing Graphic Overrides&lt;/P&gt;&lt;P&gt;9) Visibility/Graphic Overrides -&amp;gt; Override Host Layers -&amp;gt; Cut Line Styles&lt;/P&gt;&lt;P&gt;10) Visibility/Graphic Overrides -&amp;gt; Projection/Cut Lines&lt;/P&gt;&lt;P&gt;11) Materials within the wall Family (Cut, Pattern, Colour)&lt;/P&gt;&lt;P&gt;12) Project Object Styles&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;As far as I know the position of MEP overrides isn't formally documented by determined by others through trial and error.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;My problem is the order of items 6, 7, &amp;amp; 8.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I want my pipes and ducts to have a certain look (both link thickness and line type), UNLESS they are below the floor (which in my case should be dashed linetype), and UNLESS they are being demolished (which in my case should be dashed differently than underfloor and thicker lines).&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Currently I am using a combination of worksets and filters to get the desired look because the MEP graphic overrides are killing both phasing and beyond settings.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I propose that items 6 and 8 in the above list be swapped so the new order would be:&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Phasing Graphic Overrides&lt;/P&gt;&lt;P&gt;View Depth - Beyond Line Style&lt;/P&gt;&lt;P&gt;MEP System Graphic Overrides&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;</description>
      <pubDate>Wed, 20 Oct 2021 15:36:13 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-ideas/mep-system-graphic-overrides-in-the-wrong-hierarchy-order/idi-p/10701620</guid>
      <dc:creator>jcox-arc</dc:creator>
      <dc:date>2021-10-20T15:36:13Z</dc:date>
    </item>
    <item>
      <title>Re: MEP System graphic overrides in the wrong hierarchy order</title>
      <link>https://forums.autodesk.com/t5/revit-ideas/mep-system-graphic-overrides-in-the-wrong-hierarchy-order/idc-p/10701654#M41377</link>
      <description>&lt;P&gt;I don't necessarily think switching them will solve the issue, as someone else might be relying on the current order of priority. However, I do think it's important to clarify what the hierarchy is and it would be helpful to allow the user to modify that hierarchy to an extent.&lt;/P&gt;</description>
      <pubDate>Wed, 20 Oct 2021 15:48:23 GMT</pubDate>
      <guid>https://forums.autodesk.com/t5/revit-ideas/mep-system-graphic-overrides-in-the-wrong-hierarchy-order/idc-p/10701654#M41377</guid>
      <dc:creator>AGGilliam</dc:creator>
      <dc:date>2021-10-20T15:48:23Z</dc:date>
    </item>
  </channel>
</rss>

