I'm got big head aches. New to Vault and I am loading a lot of files.
Having problems getting idw's from WIP to Released because Vault says that a old revision of the logo bmp is not released.
What I have done so far was to open the idw and replace the title block with an enbeded logo.
Is there a better way, I don't want to go into thousands of files?
Thank You,
Question,... do you need to have the bitmap released? If not, you can go into your lifecycle definition, edit the Transition for WIP - Released, look to see what id checked in there. My guess is for that logo, it is probably either linked files, or contained files. See image. Try unchecking that if it is checked, then Vault won't care what the status is of those linked or contained files, when it transitions your part or drawing files.
Worth a shot?
Chris Benner
Inventor Tube & Pipe, Vault Professional
Cad Tips Tricks & Workarounds | Twitter | LinkedIn
Autodesk University Classes:
Going With The Flow with Inventor Tube and Pipe | Increasing The Volume with Inventor Tube and Pipe | Power of the Autodesk Community | Getting to Know You | Inventor Styles & Standards |Managing Properties with Vault Professional | Vault Configuration | Vault - What is it & Why Do I Need It? | A Little Less Talk - Tube & Pipe Demo | Change Orders & Revisions - Vault, Inventor & AutoCAD | Authoring & Publishing Custom Content
This suggestion would work, but it would also cause it to not check any other references the file might have.
Also, because the IDWs have a relationship to the previous revision in Vault, in the future if you do a get revision (or pack and go, batch plot) of the specific revision, the old logo will be used.
What you may want to do is make the drawings reference the correct revision of the logo in Vault. The only way to do that is to download the correct revision of the IDW and the logo, check the IDW out and check it back in.
I have done this before by using Inventor Task Scheduler.
Hope this helps.
Hi, If I did do this with the Task Scheduler would I have to setup 3 different tasks?
Check out from Vault
Get Latest from Vault
Check in to Vault
What I would like to do is do a mass replace of my title block with a new one that has an embeded Logo.
Does anyone have an app that can do that inside out outside of Vault?
Mikel,
Here is some more information.
In Capture1 is showing in Vault Browser shows idw in the latest Work in Progress state. Logo shows Revision A
In Capture 2 I have checked out idw and open it in Inventor. Logo shows Revision - with grey triangle?
In Capture 3 is showing - Work in Progress and the Logo is showing the Revision -
So far the only way I found to get the logo in the drawing to Rev a is to check out the logo, still shows Rev -,
then undo checkout of logo, then revision changes to Rev A. Then I can check in drawing and change state to Released.
Don't know what else to do.
2013 Collaboration
Image 1 is showing the latest view, this does not really show what you need to know.
What you are most interested in is what revision "-" of idw is actually consuming in Vault. Image 3 is showing that revision "-" of idw is related to revision "-" of logo.
Because revision "-" of logo was never released you are not able to release the IDW.
What method are you using to open the IDW? If you use Vault explorer (double click) it does not do a download of Latest. It does a download of the revision (what is shown in image 3). This is something we have changed in the 2014 release, it now does latest.
What you want to do is download latest and checkout the drawing. To do this you need to use Get/Checkout and then open from Inventor, or use Open from Vault and then checkout in Inventor. Then check it back in. This should cause the idw to consume the newer revision of logo.
Hope that helps.
Is there a way that I can go back the Release logo Revision ( - )?
You can not change historical data in the Vault.