Doubling Item BOM revisions

2 REPLIES 2
Reply
Message 1 of 3
Maxim-CADman77
263 Views, 2 Replies

Doubling Item BOM revisions

There is some misunderstanding regarding Item revisions in our Vault.

It was notieced that some assy Item have the only revison entry "0" in drop-down list on General tab:

Item_Rev_General.png

On "Bill Of Material" tab of that same Item there are several entries "0" present in Revision drop-down list:

Item_Rev_BOM.png

Could somebody comment origination of those doubling revisions on Item BOM tab?

Thanks in advance.

 

 

2 REPLIES 2
Message 2 of 3

First of all - Installing SR1 SP1 haven't solved the issue.

Next thing to take to consideration:
The root of issue is probably some change in Vault behaviour (not sure the change introduced deliberately).
Steps to reproduce.
1. Create Item and publish it (whitness the only revision at BOM tab).
2. Create IAM file containing some IPT file with "Part Number" value equal to Number of Item at step 1.
3. Check-in IAM and perform "Assign Item" command. Use "Auto select first dublicate" option.
Whiness the following changes to Item from step 1:
A. Date "Last updated" have changed.
B. IPT file is now present among "associated files"
C. doubling revisions occur at BOM tab
moreover IPT file is locked now.

I don't understand how the system with such behaviour is supposed to be used ?!