How do you change the date format as in the date shown in the Checked In (Date Only) of the customized fields for Collaboration 2013? It is currently setup as dd/mm/yyyy.
Thank you
The field shows the date as per the system date setting. You can refer the following blog link to change the date format that you want.
Note: This is a system wide change and the date format gets changed for all places in the system as per this setting.
http://manufacturingtoolbox.typepad.com/my-blog/2011/06/changing-your-date-format-in-inventor.html
Once you do the change as mentioned in the above link the date in the Checked in (Date Only) will change it automatically to reflect the settings.
Thank you. That got me started.
My Windows 7 it is Control Panel, Region and Language, Formats Tab.
You have to re-open Vault to see the results.