Is there any way to generate an Engineering Change Order (ECO) report in Autodesk Vault Professional 2012 that will show you how long all ECOs stayed in each State before they were totally Closed out. Example: How long did the ECO stayed in the Create State before being pushed to the Open State, how long did it stay in Open State before being pushed to Work State and how long did it stay in the Work State before pushed to the Review State, ect.
Thanks - Robert
IV 2018 Pro-Suite / VP 2018, Windows 10 - 64 Bit, HP Z8 Intel (R) Xeon (R) Silver 4114 CPU @ 2.20 GHz