Hi,
I found New Change Order grey out at the file already under a existing CO. Is it possible I create multiple change order from same file, (or link of that file), in this case, an email from outlook?
The reason I asked, there is a case, our client sent us email, from that email, we may create multiple CO.
Thank you so much.
Thanks
Wes
It is not possible to have a single file controled by more than one Change Order.
However, you can attach a file to multiple change orders.
When you go to the change order you will see the records tab and the files tab.
Records are files and items that are controled by the change order.
File are files that are attached to the change order.
Hope this helps.
I was able to create two ECO's with the same file as an attachment on the Files tab. I believe if you add them as Records, you will only be able to do this to one ECO.
Chris Benner
Inventor Tube & Pipe, Vault Professional
Cad Tips Tricks & Workarounds | Twitter | LinkedIn
Autodesk University Classes:
Going With The Flow with Inventor Tube and Pipe | Increasing The Volume with Inventor Tube and Pipe | Power of the Autodesk Community | Getting to Know You | Inventor Styles & Standards |Managing Properties with Vault Professional | Vault Configuration | Vault - What is it & Why Do I Need It? | A Little Less Talk - Tube & Pipe Demo | Change Orders & Revisions - Vault, Inventor & AutoCAD | Authoring & Publishing Custom Content