Hi,
I'm close to finish my first Vault AddIn. I create some function to use ECO and just found out nobocy have the permission of Change Order Routing Create/Edit except Administrator.
I don't want to gave out Administrator permssion. Is there any way, the user does not have the permission of Change Order Routing Create/Edit, my function can?
Thank you
Wes
Vault Pro 2014, Windows 7 64 bit, AutoCAD (ACA, Map) 2014
Hi,
I'm just wondering, if possible, I create a account with Administrator permission. I will login in my application, get all the information I need, then switch to current user account.
Please advice.
Thank you so much
Wes
The following posts show how to use the connection the AutoCAD add-in is using:
http://adndevblog.typepad.com/manufacturing/2013/09/autocad-2014-vault-add-in-connection.html