I've been running a fill + pack analysis on a 3d model with 3.2 million elements for a few days. The job manager says it is 100% done and almost all the results are available except for weld lines, but the study will not complete. This is an issue since I can't generate an MFR or powerpoint report. I have left it at 100% for over 36 hours without it finishing.
Is there any way I can force it to finish? This is the 3rd time this file has given me this issue, even with re-importing and remeshing the part.
Thank you,
Jeff
hi,
you just close the software and open again the same, it will completed. don't worry analysis will not fail.
i faced the same problem so many times but dont restart the system