When calculating displacements in Robot using the concrete stiffness I get displacements around 12mm for my SLS-combination. When doing a slab req reinforcement I get 38mm displacement.
Can anyone explain this? Shouldn't the displacment be smaller?
I also get an error message when calculating slab req. reinforcement for panel 152.
Solved! Go to Solution.
Solved by Rafal.Gaweda. Go to Solution.
Thanks!
I've done that and get staisfying results. But, how do I choose the worst SLS-combo, or do I always choose SLS 1?
Error 5000 - are you able to reproduce it?
If so please record movie showing your way.
Try after calcaulation of required reifnorcement save the file, restart robot, relaod the file, run Verification
I understand it have something to do with memory? I'll try to record a later. Construction site is waiting.
I get the error but also get results.
I understand it have something to do with memory?
Yes, error 5000 means that memory is overwritten by Robot.
Try after calcaulation of required reifnorcement save the file, restart robot, relaod the file, run Verification
Did this now and the same error came.