Seems to me Revit Structure 2008 is reporting the wrong estimated
reinforcement volume.
For example:
I draw a 10m long concrete beam (300mmX600mm)
Then add a 19M rebar to it (10m long)
In the beam properties, the estimated reinforcement volume is shown as 0.006
m3
If I pick the rebar, Revit shows it's reinforcement volume as 0.006m3
Shouldn't a 19M rebar (ASTM A615M, which has a 19.1mm diameter and a section
area of 284mm2) by 10m long, have a volume of 0.0028 m3 ??
Cheers,
Jorge