On this project I have a steel deck and OWSJ roof beside a hollow core 2nd floor. The top chord of the joist extends past the steel beam that it's suppose to be sitting on to under the hollow core. I want the joist to sit on top of the steel beam without a joist top chord extension. How do I change this?