Hey guys,
I've got two floors (main floor and second floor), and the second floor framing are showing up on the main floor. I've checked the 'view range', and no matter what my view range is, the second floor framing remains, unchanged, but grayed out. I know for sure the view range is not at fault. What am I doing wrong? Please help.
Solved! Go to Solution.
Solved by mcudal. Go to Solution.
I've figured it out.
In the plan view, if I go through the properties under graphics, the underlay should be 'none'. It was previously selected to the second floor.