I am using Revit MEP 2009. I am currently trying to draw a vertical duct main in a multi-story building. The problem is I cannot see the vertical duct in plan view. I have multiple taps off the vertical duct main to feed a certain floor. Currently the vertical duct main has no connection on either the bottom or the top as this is a renovation of a tower floor and I only need to see one floor. Is there a setting I am missing so I can see my vertical duct? I have looked through visibility graphics, View range, and Mechanical settings. Using sections I can see the vertical duct and know that is placed in the right area. I can even see it in a 3D view but as soon as I go back to a plan view it disappears. Any one know what I am missing?