Hi,
I have office building HVAC project, it serve by Roof central AHU, it supplied to VAVs, those VAVs are in their own system (ducts and air terminals) and when select any duct downstream of the VAV Revit MEP System inspector is available and I can check pressure flow etc ...
My question is what should be the flow configration on VAV inlet, and on the AHU out and In so, I can have system inspector available also???
Please help
Thanks