I have a large sequence of operations schedule for my 1st and 2nd floors and it will not fit in one sheet. I am using a space schedule to do this work and curerntly have the spaces shown for the 1st and 2nd floors in one schedule. Is it possible to have the single schedule span on to two sheets?
I tried duplicating the schedule to have a schedule for each floor on a seperate sheet but when I go to delete the 1st floor information on the 2nd floor schedule it puts up a disclaimer that my spaces and tags will be deleted. Is this true?
Thanks.