Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
This page has been translated for your convenience with an automatic translation service. This is not an official translation and may contain errors and inaccurate translations. Autodesk does not warrant, either expressly or implied, the accuracy, reliability or completeness of the information translated by the machine translation service and will not be liable for damages or losses caused by the trust placed in the translation service.Translate
Does anyone know of a way to turn off the "behind the scenes" calculations that are going on in Revit MEP? Every time a duct is modified or added to a system, it takes a long time to generate it. Thanks.
I've been told by Autodesk that the "behind the scenes" calculation feature cannot be deactivated. It is in the very core of the Revit code. However you can get around this by not connecting ductwork and leaving a gap between duct connections. This is crude and defeats the whole purpose of a parametric BIM but it speeds things up.