Revit MEP

Reply
Mentor
CraigGorsuch
Posts: 153
Registered: ‎02-01-2007
Message 1 of 4 (365 Views)

Exis, Demo & New lights, maintain phased circuiting

365 Views, 3 Replies
01-27-2011 01:44 PM

Our Electrical engineers are working on a renovation project, and wondering if there is any way to have the Demolition property of a light fixture and its associated circuit can be maintained through the Exis/Demo/New project schedule.

 

Our engineer needs to make sure the existing load balance is maintained in this renovation, but every time we demo a light fixture, that fixture is removed from the circuit.  When we look at the fixture in an “existing” view, the light fixture is no longer connected to the existing circuit (existing panel board.)  We want the light fixture to maintain its circuit in the Existing phase, but not the New Construction phase.

 

Our engineers would like to see the load balancing schedule for the existing phase and compare it to the new phase in the same Revit model.  Is this possible?  If not, what is a workaround?

Contributor
p_bergsieker
Posts: 16
Registered: ‎01-19-2011
Message 2 of 4 (136 Views)

Re: Exis, Demo & New lights, maintain phased circuiting

01-29-2013 05:10 PM in reply to: CraigGorsuch

Has anyone figured out a workflow for this yet, besides using dumb text? Thanks!

*Expert Elite*
CADastrophe
Posts: 3,286
Registered: ‎08-28-2009
Message 3 of 4 (130 Views)

Re: Exis, Demo & New lights, maintain phased circuiting

01-30-2013 05:37 AM in reply to: p_bergsieker

Instead of demolishing the elements, perhaps you could place them on a designated Workset. That way, you can control the visibility of the demolished elements with a View Filter to hide them when necessary and change their appearance as desired. This method would not work well with existing schedules, as you cannot filter out these elements by Workset.

 

Another method would be to create a Shared Parameter that is added to all model Categories, and then use that to designate an element as demolished. This would allow the elements to be affected by a View Filter as well as provide a way to filter demolished elements from the schedules.

Corey D.                                                                                                                  ADSK_Logo_EE_2013.png    AutoCAD 2014 User  Revit 2014 User
──────────────────────────────────────────────────────────────────────
⁞|⁞ Please use Mark Solutions!.Accept as Solution and Give Kudos!Give Kudos as appropriate to further enhance these forums. Thank you!
Active Contributor
DMaurer-Veca
Posts: 49
Registered: ‎10-02-2012
Message 4 of 4 (124 Views)

Re: Exis, Demo & New lights, maintain phased circuiting

01-30-2013 08:17 AM in reply to: CADastrophe

Here is my idea (not necessarily a good one): once I have the existing fixtures in place and circuited to the exisitng panels I would place annotation symbols only to represent the existing/demo plan. Then I would hide the fixture elements in the existing/demo view. With the fixtures showing in the 'new work' plan I would move them to the new locations. This would maintain the existing load scenerio at the panels and give good data for additional capacity.

Diane M
Announcements
Are you familiar with the Autodesk Expert Elites? The Expert Elite program is made up of customers that help other customers by sharing knowledge and exemplifying an engaging style of collaboration. To learn more, please visit our Expert Elite website.
Need installation help?

Start with some of our most frequented solutions or visit the Installation and Licensing Forum to get help installing your software.