I'm know this has been brought up before, but I want to add my vote: The panel schedules need serious help:
1. You need to be able to resize them easily. 2 panels per 30"x42" sheet is unacceptable.
2. There should be a way to force multi-circuit home runs together to adjacent breakers. Besides being good practice, as more jurisdictions adopt NEC 2008 we will be required to tie circuits with common neutrals together with either handle ties or multi-pole breakers.