Revit MEP Wishes (Read Only)
cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Disable System Calculations

0 REPLIES 0
Reply
Message 1 of 1
adam.jw
713 Views, 0 Replies

Disable System Calculations

When you're in production mode. Trying to draft, re-host fixtures, modify wires etc --- on a full building with ALL the panels circuited and calculating ------ TRYING TO MOVE WIRES, OR REHOST ANYTHING BOGS THE SYSTEM DOWN DRASTICALLY.

 

What would be better --- is instead of calcing everything in real time, give us the option to temporarily DISABLE calculating loads and other system calculations UNTIL A SYNCHRONIZE TO CENTRAL IS PERFORMED.

 

I love that everything links up so nicely in Revit, it's wonderful --- but when you're trying to get a job out the door (as I am right now), waiting a good 4-5 mississippi just for FREAKING wire to move makes you want to imbibe Clorox.

 

We can disable load calcs for spaces... now how about just disabling load calcs altogether until I'm done with my "drafting"?

 

Peace and love,

 

Adam

____________________________________________________
Please give kudos to the MEP Wish List ideas you like, as this will help the Revit development team prioritize functionality additions!
0 REPLIES 0

Can't find what you're looking for? Ask the community or share your knowledge.

Post to forums  

Autodesk Design & Make Report