the situtation is splitting a floor face in the exiting phase to "paint" the floor tile pattern in the existing restrooms and then removing that once in the new phase and resplitting to "paint" the new pattern...
is it possible to split a floor face in existing phase, paint it, then move to new face and un-split and paint it to create a new split and new paint?
any experinece in doing this / failing at this would be appreciated
Don´t do floors with paint and split face. That is very anti-BIM. Create your finish floor as a thin floor element, on top of the structural floor, as it really is. By doing this, you can assign one finish in one face, and another finish in another face, or no finish in one phase, and finish in the next phase, etc.
Sorry to revive such an old post, but what do you mean by a "thin" floor. if you mean like a 1/4" tile with a 1/4" thickness above the floor?... this will cover any line work a family may have at the floor level, and any model or annotative line work.
for example, in my door family i have all the pull and push side clearances in the door family, at level. if i put a "thin floor" this will cover my line work needed to design walls and doors. so a "thin floor" of any thickness will cover this. if i put the new floor at the level then both hatches show at the same time.. this is unacceptable.
the only way, i have been able to do this is to create TWO floors in different worksets, 1 in existing/demo and 1 in existing/new and adjust visibility parameters for each.
Please clarify...