Hi,
We're working on solar studies of an office project. However, in the
building location we have a solar time difference of almost 1h36 between the
real solar time and the legal time.
So, when I input say 12h in revit for the solar study, which time is it
computing? real solar time or legal time?
Thanks,
R Dias