What is the best way to set up a site plan for a single building?
I'm using civil consultant base plans that will be updated from time to time.
I want to be able to move my building around adjusting as needed.
Should I set it up like I would if I had multiple buildings, creating 2 files, one for the site plan and one for the building and reference them into each other or just create a single file? It seems difficult to move a building in a single file that includes the site plan.