I'm pulling together a model which will need a schedule of existing furniture, and also have a schedule of proposed furniture, as the proposed will be a subset of the existing. I'm going to have to do a cross check to make sure I'm not putting in more furniture items than we alreday have.
Question is, what is the best way to do this?
Is it to create a design option for the existing, and have a separate option for the proposed, or can I keep the existing in the main model, and just have a seperate design option for the proposed?