Hi all - I am sorry if this is old-hat for everyone, but I am new to Revit (been using ACA for years).
Anyway, I am creating my title block family from scratch and have all the labels and line weights all figured out. The only thing I am missing is the revision schedule. I have searched through other threads and videos but cannot locate anywhere how and where to create this schedule table.
I see that in the out of the box template, the schedule is there - but I do not know how to create it in my family.
I appreciate any help (and patience from all you seasoned Revit users) with all due respect and gratitude.
Thanks
-Dave
The revision schedule gets created when the titleblock is being created.
If you open the titleblock family and go to the View Tab there should be a Revision Schedule command shown. When you select that command it will open a Revision Properties menu. Select the fields needed or wanted and then place that on the titleblock in the desired location.
Hope this helps you out.
Forgot to mention you have to drag the schedule from the titleblock project browser location onto the titleblock to place it.