Anyone else receive this messsage using Revit 9.1? I am on step 42 of 300 doing walk through and I received the error message.

' C 24-Feb-2007 23:36:02.703; [ 42 of 300 ]
' C 24-Feb-2007 23:36:03.343; Start Photorealistic calculation.
' MessageBox "Operation was canceled by the user."

I have a dual core Dell M65 with 2GB and have the 3GB switch enabled.