Move to 0-0?

5 REPLIES 5
Reply
Message 1 of 6
PhilvK
2767 Views, 5 Replies

Move to 0-0?

I gather that Revit doesn’t “need” coordinates, but if I wanted to move the walls below from the corner to 0-0, is it possible, and if so, how? It looks like you can’t select it and move it to a specific point, correct?

 

Move.jpg

 

5 REPLIES 5
Message 2 of 6
Alfredo_Medina
in reply to: PhilvK

In Revit, usually we don't move the building. Unless you are just starting the model and those walls are the only elements so far. If that's the case, you can turn on the Project Base Point, which by default, in the template, is at 0,0. Then you could move the walls to that point. If you already have a more elaborated model, it is not recommended to move it. In this case, you would specify coordinates at that point as 0,0.


Alfredo Medina _________________________________________________________________ ______
Licensed Architect (Florida) | Freelance Instructor | Autodesk Expert Elite (on Revit) | Profile on Linkedin
Message 3 of 6
PhilvK
in reply to: Alfredo_Medina

Thank you, but how would you "specify coordinates at that point as 0,0"?

Message 4 of 6
Alfredo_Medina
in reply to: PhilvK

On the ribbon: Manage > (Project Location Panel) > Coordinates > Specify Coordinates at Point.


Alfredo Medina _________________________________________________________________ ______
Licensed Architect (Florida) | Freelance Instructor | Autodesk Expert Elite (on Revit) | Profile on Linkedin
Message 5 of 6
PhilvK
in reply to: Alfredo_Medina

Thank you!
Message 6 of 6
Alisder.Brown
in reply to: PhilvK

PhilvK

 

IF you want to specify coordinates at a certain point, it is kind of opposite to what you would normally do. 

In Revit, you move the coordinates to a specific point in your project. BUT, it is seen as best practice NOT to do this within your PROJECT file. Most projects, you want to have 2 files, one PROJECT file with your building modeled WITH NO COORDINATES, and a second SITE file, with your Northings, Eastings, Elevations and True North set up only. The work flow is to link your PROJECT file into your SITE file and move the linked PROJECT to specific Coordinates on the site.

 

Watch this screencast on how to specify coordinates at a certain point:

https://screencast.autodesk.com/Main/Details/f955fd44-3db5-4999-95d5-fe8d46b5cccc

 

Hope this helps

Alisder Brown
Senior BIM Coordinator
Scotland, UK