How does the Cost parameter in materials work in Revit? I know you can set a value for a cost. But what amount of that material is the cost associated with? For example, if I set a cost 3.00 for Common Brick, is that 3.00/unit, 3.00/sq. ft., etc?
Thanks!
hi
Please go to the following link Download the tutorials.
Using Schedules for Material Cost Estimation in Revit