If you created your wall with material components as described, you should
be able to create a wall assembly material take-off schedule and set the
phasing to match your demolition phase.
wrote in message news:6284482@discussion.autodesk.com...
I need to find out how much gyp board we are going to remove from an
existing building. I have drawn the walls as a typical 3 5/8" stud with gyp
on either side and then changed them to existing and then to be removed
during new construction. I think I am good so far.
Can someone point me in the right direction or toward a quick tutorial to
find out how much gyp board there is? I have started playing around with
material take-offs, but not had any luck.
Thanks Wiley