Revit Group,
I have been working on door schedules displaying the To Room and From Room
parameters. In a typical floor, there are many floor level changes between
one to three feet difference. Rooms are typically level dependent. Revit is
not consistent in displaying the room names in the schedule. Revit will
sometimes will register the room in the schedule even if the room is not on
the same level as the door and sometimes it will.
Has anyone had the same problems?
This is a very large renovation project. There are lots of existing walls to
remain and new construction further complicating the situation.
Leo
CAD (ahem) Revit manager