Community
I have several assemblies with 100+ unreleased sub-items.
When I add them to a change order I have to find them at the top level and select them one at the time.
When I select the top level assembly I can see the subasseblies and items, but it does allow me to select them. I have to find them all at the top level.
Why not allow me to select items in a BOM tree?.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.