Hello.
I would like to know if there is a way to insert drawing no.1 into drawing no.2 (not copy sheets!) so that if I change the drawing no.1, the drawing no.2 (the one that contains no.1) also updates.
That is because I would like to have one part of the drawing that is ''standard'' and multiple drawings that contain this part (so that this part is defined in all drawings but is always the same). Because I don't want to have a separate drawing for the ''standard'' part, but only drawings that contain it.
Or if there is some kind of alternative it would also be great.
Thanks and best regards.
@carloscarreiras8703 wrote:Hi!
Just Copy/Paste the views you need.
Did you find this reply helpful ? If so, use the Accept as Solution or Kudos - Thank you!
Hi,
That's just what I wouldn't like to do because this way the annotations in these views wouldn't upate on all drawings at once, but I would have to correct them manually on each drawing.